EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 3, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a military facility in Mosinee, Wisconsin. Completed plans call for the renovation of a military facility.

As of January 3, 2024, the project has not been awarded. A timeline for award has not been confirmed. Replace Boiler and Install AC and DDC Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. In general, the work consists of replacing the existing steam boiler system with more efficient hot water boiler system, replace the existing steam/condensate piping throughout the facility with hot water supply and return piping, replace steam terminal units with hot water terminal unit. Provide complete DDC system to control and monitor the HVAC system. Provide new electrical service and building electrical distribution system. New ceilings and lighting will be provided in the office area to accommodate new hot water piping. Paint, patch, and provide finish work as identified in the documents. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineers attention at least ten (10) days before MEP bidding commences. Question Deadline 09/17/2023

Bid Results

Military

$960,116.00

Public - State/Provincial

Renovation

30

18

2

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
29
Bidding Soon
222
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

November 27, 2023

img_map_placeholder

701 11th St, Mosinee, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.