BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Hayesville, North Carolina. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of September 14, 2022, this project is on hold. A timeline for rebidding has not yet been determined. For NC Department of Transportation - Division 14 - Clay County Assembly Office and Maintenance Building This scope of work consists of construction of a 5,409 Office and Maintenance Facility for NCDOT. The building consists of wood framing, CMU block, pre-engineered metal building, cement board siding/trim and architectural shingles and MEP systems, site work consisting of underground utilities and utility connections, paving and rough grading All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for building. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days. The owner reserves the right to reject any or all bids and to waive informalities This scope of work consists of construction of a new 6,000 SF Assembly Office and Maintenance Building for NCDOT. The building consist of wood framing and CMU block with cement board siding/ trim and architectural shingles and EPDM roof system. Roof structure is steel bar joint and wood trusses. Site work consist of underground utilities, rough grading and concrete aprons. NCDOT will perform final grading and pavement. The building will also include MEP systems. The time of completion for construction shall be 360 consecutive calendar days from the said date.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$1,675,850.00

Public - State/Provincial

New Construction, Site Work

62

28

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
47
Bidding Soon
1,035
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2021

January 30, 2023

img_map_placeholder

225 Tusquittee St, Hayesville, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.