BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Buffalo Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Location Dundee Road, Cambridge Drive, Anthony Road, Cambridge Court, and University Court Village of Buffalo Grove, Cook and Lake County, Illinois that sealed bids will be received for the 2021 Cambridge Utility and Street Improvements project. This project includes, but is not limited to, the following major work items: pavement removal; preparation of base; water main replacement and related appurtenances; water service lines; storm sewer improvements and spot repairs; sanitary sewer replacement and related appurtenances; sanitary sewer service lines; curb and gutter, and sidewalk removal and replacement at various locations; pavement patching; hot-mix asphalt binder and surface course(s); parkway restoration; and other appurtenant work for a total distance of 1.0 mile on Dundee Road, Cambridge Drive, Anthony Road, Cambridge Court, and University Court in the Village of Buffalo Grove. State of Illinois, Department of Transportation, Contractor Pre-Qualification and Subcontractor Pre-Qualification/ Registration is required. Bid security in the form of a Bid Bond, Bank Cashier Check or Certified Check in the amount of TEN (10) percent of the total bid amount made payable to the Village of Buffalo Grove shall accompany the bid. This work is subject to the wage provisions of the Illinois Prevailing Wage Act. 820 ILCS 130/0/01 et seq. and the Illinois Substance Abuse Prevention on Public Works Projects Act. 820 ILCS 265/1 et seq relative to prevailing wages of laborers, mechanics, and other workers employed in any Public Works as amended by Public Acts 86799 and 86693. The Village of Buffalo Grove reserves the right to reject any and all bids and bidders and to waive all technicalities. All bid proposals submitted shall be valid for a period of one hundred twenty (120) days. The Village reserves the right to award to any bidder based on negotiation with any and all bidders after receipt of bids.

Award

Roads / Highways

$3,526,942.00

Public - City

Paving, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
101
Bidding Soon
2,077
All Active Projects
899
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2021

June 10, 2021

img_map_placeholder

Multiple Locations, Buffalo Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.