Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Elk Grove Village, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The scope of the work shall consist of furnishing and storing materials and equipment, delivering materials and equipment, and performing work to replace or repair appurtenances damaged as the result of incidents that occur systemwide. Incidents generally consist of discernible events such as vehicle crashes, weather, or other unforeseen occurrences that lead to damaged Tollway median or roadside elements ("Appurtenances"). Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4276D.4579_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on May 4, 2021 The improvements to be constructed under this contract shall be performed at various locations on the Illinois Tollway System including the: Reagan Memorial Tollway (I-88), Jane Addams Memorial Tollway (I-90), Tri-State Tollway (I-294/94), Veteran's Memorial Tollway (I-355), and Elgin O'Hare Western Access (IL-390) in the counties of Boone, Cook, DeKalb, DuPage, Kane, Lake, Lee, McHenry, Ogle, Whiteside, Will, and Winnebago. The repair locations are anticipated to be on the Reagan Memorial Tollway between Milepost 117.0 (IL RT 31) and Milepost 140.4 (I-290), the Jane Addams Memorial Tollway (I-90) between Milepost 54.6 (IL RT 31) and Milepost 78.6 (I-190), the Tri-State Tollway (I-94) between Milepost 0.5 (Russell Road) and Milepost 30.0 (Edens Expressway), the Tri-State Tollway (I-294) between Milepost 0.0 (IL 394) and Milepost 52.4 (I-94), the Veterans Memorial Tollway (I-355) between Milepost 0.0 (I-80) and Milepost 29.8 (Army Trail Road) and the Elgin O'Hare Western Access (IL 390) between Milepost 5.9 (Lake Street) and Milepost 13.5 (Arlington Heights Road). Work may be done adjacent to Tollway mainline pavements, ramps, within interchanges, or within toll plaza areas systemwide. This contract does not specify any specific work locations directly, rather all intended work will be directed in writing in accordance with a series of Engineer's Task Orders and/or Work Orders that will be issued individually on an "Upon Request / As Needed" basis subsequent to the Award of this Contract. The work to be completed under each Task/Work Order will consist of furnishing and storing materials and equipment, delivering materials and equipment, and performing Work to replace or repair appurtenances damaged as the result of Incidents that occur systemwide. Incidents generally consist of discernible events such as vehicle crashes, weather, or other unforeseen occurrences that lead to damaged Tollway median or roadside elements ("Appurtenances").
Bid Results
Roads / Highways
$4,933,307.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 18, 2022
March 18, 2022
Multiple Locations, Elk Grove Village, IL
Related To This Project
Elk Grove Village, IL
Bid Date: Sep 30 2022
Elk Grove Village, IL
Bid Date: Dec 27 2022
Elk Grove Village, IL
Bid Date: Jan 31 2023
Elk Grove Village, IL
Bid Date: Jan 20 2021
Elk Grove Village, IL
Bid Date: Feb 02 2023
Elk Grove Village, IL
Bid Date: Apr 15 2024
Elk Grove Village, IL
Bid Date: Feb 14 2023
Elk Grove Village, IL
Bid Date: Feb 28 2023
Elk Grove Village, IL
Bid Date: Jun 12 2020
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Aug 25 2022
Elk Grove Village, IL
--
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Aug 02 2022
Elk Grove Village, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.