BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Elk Grove Village, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The scope of the work shall consist of furnishing and storing materials and equipment, delivering materials and equipment, and performing work to replace or repair appurtenances damaged as the result of incidents that occur systemwide. Incidents generally consist of discernible events such as vehicle crashes, weather, or other unforeseen occurrences that lead to damaged Tollway median or roadside elements ("Appurtenances"). Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4276D.4579_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on May 4, 2021 The improvements to be constructed under this contract shall be performed at various locations on the Illinois Tollway System including the: Reagan Memorial Tollway (I-88), Jane Addams Memorial Tollway (I-90), Tri-State Tollway (I-294/94), Veteran's Memorial Tollway (I-355), and Elgin O'Hare Western Access (IL-390) in the counties of Boone, Cook, DeKalb, DuPage, Kane, Lake, Lee, McHenry, Ogle, Whiteside, Will, and Winnebago. The repair locations are anticipated to be on the Reagan Memorial Tollway between Milepost 117.0 (IL RT 31) and Milepost 140.4 (I-290), the Jane Addams Memorial Tollway (I-90) between Milepost 54.6 (IL RT 31) and Milepost 78.6 (I-190), the Tri-State Tollway (I-94) between Milepost 0.5 (Russell Road) and Milepost 30.0 (Edens Expressway), the Tri-State Tollway (I-294) between Milepost 0.0 (IL 394) and Milepost 52.4 (I-94), the Veterans Memorial Tollway (I-355) between Milepost 0.0 (I-80) and Milepost 29.8 (Army Trail Road) and the Elgin O'Hare Western Access (IL 390) between Milepost 5.9 (Lake Street) and Milepost 13.5 (Arlington Heights Road). Work may be done adjacent to Tollway mainline pavements, ramps, within interchanges, or within toll plaza areas systemwide. This contract does not specify any specific work locations directly, rather all intended work will be directed in writing in accordance with a series of Engineer's Task Orders and/or Work Orders that will be issued individually on an "Upon Request / As Needed" basis subsequent to the Award of this Contract. The work to be completed under each Task/Work Order will consist of furnishing and storing materials and equipment, delivering materials and equipment, and performing Work to replace or repair appurtenances damaged as the result of Incidents that occur systemwide. Incidents generally consist of discernible events such as vehicle crashes, weather, or other unforeseen occurrences that lead to damaged Tollway median or roadside elements ("Appurtenances").

Bid Results

Roads / Highways

$4,933,307.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
2,009
All Active Projects
868
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2022

March 18, 2022

img_map_placeholder

Multiple Locations, Elk Grove Village, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.