Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Ma-Me-O Beach, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

The Summer Village of Argentia Lake Inlet Improvements Project consists of the following approximate quantities: Removal and Disposal of Existing 900mm Culverts, Road Structure, Rip Rap, Fence and Tree Clearing. Installation of Precast Concrete Trench Boxes. Work will include Cement Stabilization with 30 kg/m2 cement. Clay Import and Compaction. Road Construction c/w Fabric and Geogrid, Gravel Base and Asphalt. Fine Grading of Ditches and Landscape Restoration with Topsoil and Hydroseed.

Post-Bid

Roads / Highways

$500,000.00

Public - County

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
39
Bidding Soon
613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2021

September 6, 2021

Project location map

Multiple Locations, Ma-Me-O Beach, AB


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed