BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.

The Work includes but is not limited to providing all labor, materials, equipment, tools and incidentals to perform, and complete electrical and telecommunication systems installations in support of Safedock equipment installation. Project scope occurs within Seattle-Tacoma International Airport associated to Concourse Gates SafeDock Equipment installation. Safedock/AVGS units shall be installed and commissioned by others. The electrical work required per Division 26 specifications includes but is not limited to the following: Electrical work of raceways, wiring, boxes, transformers, miscellaneous electrical devices, temporary power and lighting assemblies, and equipment. Provide testing and grounding in accordance with all requirements of the code-enforcing agencies. Work may also include: Revisions, relocations, and additions of power and data raceways, supports, boxes, wiring, receptacles and switches. Installation, termination, testing, and labeling of all new and remodeled Electrical infrastructure. Demolition support of existing equipment including but not limited to radio equipment and cabling, security checkpoint equipment, flight displays, signage, lighting, cameras, and other electrical systems; shall consist of securing and preserving of existing electrical circuits for future use. Installation support of radio and passenger loading bridge equipment, relocation of existing equipment, and enabling work. Contractor will coordinate with Port Construction Services for support with carpentry, concrete repairs, core-drilling, asbestos and lead abatement, and any other trade work as necessary to support the above-mentioned areas of work. The telecommunications work required per Division 27 specifications includes, but is not limited to the following: Installations of telecommunication innerducts, wireways, racks, cabinets, and demarcation and copper/fiber optic patch panels to support installation of communication infrastructure, pulling of communication infrastructure through new and existing raceways, cabling, miscellaneous communication devices, temporary assemblies, and equipment and testing, in accordance with all requirements of the code-enforcing agencies. Demolition support includes but is not limited to radio equipment, flight displays and enabling work shall consist of removing and/or securing and preserving of existing communication infrastructure for future use. Installation includes but is not limited to new and/or relocated radio equipment and infrastructure, relocating existing equipment, enabling work to accommodate the re-establishment of radio equipment, electronic displays, WiFi access points, checkpoint work, and installation of associated telecommunications equipment and systems. Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. No bid bond is required. Labor and Industries require a "Statement of Intent to Pay Prevailing Wages" and "Affidavit of Wages Paid". The expense of such is the responsibility of the Contractor. If the Port exercises its option to extend the contract an additional year, then new Intents and Affidavits will be required for the additional contract year at the prevailing wage rates published at that time. The contract rates will be amended to reflect the changes in prevailing wage, if any. A portion of this Contract requires work to be performed within an area of the Airport controlled for security reasons. All Contractor personnel working in restricted areas (including AOA, Secured, SIDA and Sterile areas) on this project shall have Port of Seattle airport-issued identification / access badges in accordance with Title 49, Code of Federal Regulations (CFR), Part 1540/1542 and the Airport Security Plan. Bidders should consider the impact of acquiring badges when preparing their bids. The Port reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in its best interest and pursuant to the terms of the General Conditions. Contract time extends from Execution of the contract through Completion as defined in the General Conditions. The Port of Seattle is an Equal Opportunity Employer and encourages Disadvantaged Business Enterprises, Minority Business Enterprises, Women Business Enterprises and Small Business Enterprises to participate in the competitive bidding process.

Post-Bid

Communication

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
88
Bidding Soon
2,278
All Active Projects
691
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 27, 2021

May 27, 2021

img_map_placeholder

Multiple Locations, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.