BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Boulder, Colorado. Conceptual plans call for the renovation of a educational facility.

This is a Request for Qualifications for Architectural/Engineering consulting services for a Phase II Fleming Building Renovation. Phase I renovations were completed in 2020 and included the Fleming 'Tower' building systems upgrades and interior renovation for the School of Education (SOE). This Phase II project will provide additional space for the SOE and include interior renovation of 10,000 to 30,000 assignable square feet (ASF) in the center area of Fleming, basement through second floor. Of the ASF, some areas will have minor renovations for finishes only and other spaces will include more extensive renovations as is required to stay within the specified project budget. The Phase I project included replacement of the building mechanical AHU's in the central basement level, provided new data closets without equipment in the central area of the building, and abated some areas of ceilings at corridors. The Phase II project will include some building systems improvements: fire suppression systems, electrical, HVAC, and abatement but it is not the intent to upgrade all the center areas or renovate stairs, exterior envelop, or other major building systems unless necessary or required by code. The project anticipates only interior renovations and will be designed with the goal of L E E D for Interiors - Gold. The total project (soft and hard costs) is budgeted at $5.5M with a construction budget of $4.2M. A sustainability consultant to administer LEED USGBC certification and energy modeling (if needed) will be under contract to CU Boulder to work directly with the selected A/E team. The project qualifies as a Capital Construction Project and will need to be sent to the Board of Regents (BOR) for review and spending authority approval at the end of the Schematic Design Phase. Materials for BOR including a program plan will be prepared by the CU planning staff based on program data, design floor plans, systems and scope narrative, cost estimate, and schedule provided by the architect and consultant team. It is assumed that this project will not need to go to the Design Review Board as renovations are limited to interior work only. Project Delivery Method: Design/Bid/Build The University of Colorado Boulder anticipates using a Design/Bid/Build (DBB) approach to project delivery. The architect will need to have a consultant to prepare estimates and schedules for the project during the pre-bid phases. Point of Contact/Clarification Name: Blake Guyer Agency: Planning Design and Construction University of Colorado Boulder Phone: 303.735.7238 Fax: N/A Email: blake.guyer@colorado.edu Pre-bid info : Dial by your location +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 669 900 6833 US (San Jose) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) Meeting ID: 985 2349 5240 Find your local number: https://cuboulder.zoom.us/u/atU4BKzLZ All communication regarding this solicitation, including addenda, will be issued via electronic posting to the University of Colorado, Design and Construction. Date Email Questions Due 5/03/2021 Date Email Answers Issued 5/04/2021 Interview Short List Announced 5/18/2021 Oral Interviews 5/20/2021 Negotiation of A/E Contract 5/24/2021 Contract Approval (projected) 6/18/2021 Schematic Design Phase 6/18/2021 - 8/20/2021 Schematic Phase Review & Cost Estimate 8/30/2021 - 9/14/2021 CU System BOR Material Prep & Submittal 9/10/2021 - 9/25/2021 CU System BOR Meeting 11/13/2021 Design Development Phase* 9/13/2021 - 12/17/2021 Design Development Phase Review & Cost Estimate 12/20/2021 - 1/06/2022 Construction Document Phase 1/07/2022 - 4/15/2022 Bidding & Contract Approval 4/18/2022 - 5/09/2022 Anticipated Construction Start/Finish 8/10/2022 - 6/01/2023 Fit-Up & Occupancy 6/02/2023 - 6/15/2023 The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$4,200,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
36
Bidding Soon
923
All Active Projects
393
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2022

img_map_placeholder

To Be Determined, Boulder, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.