Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 20, 2021 at 8:00 PM
Updated March 10, 2026
Site work and paving for a road / highway in Port Clinton, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of July 20, 2021, this project has been awarded to E S Wagner Company for $2,331,625.36. Anticipated start date Sept 13, 2021. The project consists of a proposed promenade along the east shore of the Portage River with a project length of 1300 feet from the jetty at Waterworks Park south to the Bootleggers Pier. Plans include a proposed seawall with a 12-foot walkway on top of the seawall including signage, ADA ramps and features, post-construction BMPS and drainage, all of which will be part of a single general contract bid. The project shall be bid to include all labor and materials required to complete the work as indicated on the Construction Drawings. After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent property taxes in Ottawa County, Ohio. Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Federal Labor Standard Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions. Only ODOT pre-qualified contractors are eligible to submit bids for this project. The "Prime" Contractor must perform no less than 30% of the total original contract price. Domestic steel and iron requirements as specified in the applicable provisions of Federal regulations stated in 23 CFR 635.410 and State of Ohio laws, and ORC 153.011 and 5525.21 shall apply to this project. The alteration consists of construction of an approximately 920-foot long uniform steel sheet pile wall capped with a concrete promenade, adjacent and parallel to the existing Inner East Jetty along the east bank of the Portage River within Waterworks Park. The promenade consists of a 12-foot wide multi-use walkway with ADA access points, lighting, hardscape amenities (planters and benches), bio-swales, and replacement pavement
Award
Roads / Highways
$2,331,625.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2021
September 13, 2021
Multiple Locations, Port Clinton, OH
Related To This Project
Port Clinton, OH
Bid Date: Apr 10 2026
Port Clinton, OH
Bid Date: Apr 19 2026
Port Clinton, OH
Bid Date: Jun 04 2026
Port Clinton, OH
--
Port Clinton, OH
--
Port Clinton, OH
--
Port Clinton, OH
--
Port Clinton, OH
--
Port Clinton, OH
Bid Date: Apr 07 2026
Port Clinton, OH
Bid Date: Mar 12 2026
Port Clinton, OH
Bid Date: Mar 04 2026
Port Clinton, OH
Bid Date: Mar 12 2026
Port Clinton, OH
Bid Date: Feb 24 2026
Port Clinton, OH
Bid Date: Feb 26 2026
Port Clinton, OH
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
