BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Lincolnshire, Illinois. Completed plans call for site work for a playground / park / athletic field.

The proposed project consists of the demolition, removal, disposal and replacement of thirteen (13) boardwalks within the North Park and Florsheim Nature Preserve natural areas. All locations are within the Village of Lincolnshire. This project may be phased out over a 2-4 year period. All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the Village FURNISH ALL EQUIPMENT, MATERIAL, AND LABOR REQUIRED FOR REMOVAL AND DISPOSAL OF ALL EXISTING BOARDWALKS AND INSTALL REPLACEMENT BOARDWALKS IN THE EXISTING AREAS AS DETAILED IN THE SPECIFICATIONS IN THE NORTH PARK NATURAL AREAS (1025 RIVERWOOODS ROAD, LINCOLNSHIRE, IL 60069) AND FLORSHEIM PARK (2 FARRINGTON COURT, LINCOLNSHIRE, IL 60069) This project shall include the complete removal and replacement of all existing boardwalk surface areas as identified in the locations below. This work shall include removal and replacement of decking, railing, support structure and all damaged support posts. Lumber used for construction shall be pressure treated and fasteners shall be galvanized for use with pressure treated wood. Post footings shall extend no less than 30" below existing grade and be anchored with no less than (2) 50-lb bags of quick setting concrete. Approximate width of boardwalks to resurface is 6 ft. The approximate length of all boardwalk areas varies from 32 ft. to 314 ft. Contractor may offer a repair option for each boardwalk in the schedule of unit prices which would consist of re-decking and any required repairs as opposed to a complete replacement of each boardwalk area.

Bid Results

Playgrounds / Parks / Athletic Fields

$300,555.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
100
Bidding Soon
2,016
All Active Projects
866
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2021

August 6, 2021

img_map_placeholder

To Be Determined, Lincolnshire, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.