BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2021 at 8:00 PM

Updated September 14, 2023

Site work, paving and new construction of a mixed-use development in Strafford, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a 42,000-square-foot pre-engineered storage facility; pre-engineered storage facility; and water / sewer project.

STRAFFORD HPER BUILDING – STRAFFORD R-VI SCHOOLS FOR: STRAFFORD R-VI SCHOOL DISTRICT The unified bids shall include all work included in the Contract Documents including, but not limited to the Civil, Structural, Architectural, Mechanical, Electrical, Plumbing and General Scope of work for the project. The project consists of a 42,000 square foot pre-engineered metal building to contain and indoor turf practice facility with associated classrooms, offices, storage, and restrooms. Site work will include the development of the site, ramp, stairs, sidewalk, additional parking area, supporting site utilities, and associated stormwater improvements. Refunds will be considered assuming all bidding documents are received within fifteen days of the bid and returned in good condition (original bound and without missing pages). Partial sets of plans/specifications are non-refundable. Bidders will be limited to a maximum of three (3) sets. Bid documents may be shipped for a separate, non-refundable shipping cost of $100.00, which is in addition to the $100.00 deposit. For questions regarding the project, contact the Project Architect: John Luce, AIA, Buxton Kubik Dodd Design Collective, 3100 S. National Ave. Suite 300, Springfield, MO 65807, ph: 417.890.5543. Email questions are acceptable; send to: jluce@bk-dc.com The Strafford R-VI School District reserves the right to award the contract to the lowest responsible bidder and to reject any or all bids and/or waive any technicalities or informalities in the bidding. The Strafford School District also hereby notifies all bidders that disadvantaged business owners will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for the award.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$3,803,000.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
41
Bidding Soon
655
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2021

June 1, 2021

Project location map

201 W McCabe St, Strafford, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.