Published June 9, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a mixed-use development in Summerside, Prince Edward Island. Completed plans call for site work for a power facility; and power facility.

Construction of a 21 MW Solar Farm interconnected at 34.5 kV with the battery energy storage system (BESS); interconnected at the 34.5 kV switch located on pole #1 of the Utility Interconnection line to Summerside substation. Total number of (PV 16 MW A/C 24MW D/C) ground mounted solar panels 65,5000+ will be utilized. TIMELINE: All trades secured. Construction is underway. * Total project cost is estimated at $68 million. Design-Build contract value $55 million.

Under Construction

Solar Power Generation

$55,000,000.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
8
Bidding Soon
356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2021

June 8, 2022

Project location map

To Be Determined, Summerside, PE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.