Site work, paving and outdoor lighting for a mixed-use development in Honolulu, Hawaii. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The scope of work consists of construction of an elevated pedestrian walkway bridge; construction of retaining walls, drilled shafts, jet grout columns, geosynthetic reinforced soil walls, grading and ground surcharging, sidewalks, ramps, stairs, handrails, concrete curbs and gutters, drainage system, landscaping, irrigation, pathway lighting, video cameras, and street lighting; installation of impact attenuators; pavement markings and signing; installation, maintenance and removal of temporary erosion control measures; and traffic control. Theestimated cost of construction is between $20,000,000.00 and $25,000,000.00 Due to the impacts of COVID 19, the pre-bid meeting will be conducted virtually *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Location- The elevated walkway will span Ala Moana Boulevard, between its intersections with Ward Avenue and Kamake'e Street, in Kaka'ako, Honolulu Ahupua'a, Honolulu (Kona) District, O'ahu, TMKs: [1] 2-3- 001:129, 130 (por.); [1] 2-1-058:132, 133 (por.); and Ala Moana Boulevard Right-of-Way (ROW). The project area is bounded to the north by a parking lot and structure associated with the recently demolished Ward Warehouse Shopping Center and a tract of lawn that now occupies a portion of the former Ward Warehouse; to the west and east by the Ala Moana Boulevard roadway and tree-lined median; and to the south by the Kewalo Basin and associated harbor. The project area is depicted on a portion of the 1998 Honolulu U.S. Geological Survey (USGS) 7.5-minute topographic quadrangle. Construction 797 days - Start date Wed 11/ 10/ 21 - End date Sun 12/ 1/ 24 WBE (6.9%), DBE (5.6%)
Bid Results
Bridges / Tunnels
$17,840,169.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 21, 2021
November 22, 2021
Ala Moana Blvd, Honolulu, HI
Related To This Project
Honolulu, HI
Bid Date: May 16 2022
Honolulu, HI
Bid Date: Dec 30 2021
Honolulu, HI
Bid Date: Dec 09 2021
Honolulu, HI
Bid Date: Apr 19 2022
Honolulu, HI
Bid Date: Apr 07 2022
Honolulu, HI
Bid Date: Dec 17 2021
Honolulu, HI
Bid Date: May 19 2022
Honolulu, HI
Bid Date: Mar 07 2023
Honolulu, HI
Bid Date: May 20 2022
Honolulu, HI
--
Honolulu, HI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.