Renovation of a water / sewer project in Branford, Connecticut. Completed plans call for the renovation of a water / sewer project.

The Town of Branford, Connecticut, hereby gives notice that sealed Bids will be received for the Mechanical Screen Addition project. The work at the Branford Water Pollution Control Facility includes, but is not limited to, demolition of an existing manual bar rack and furnishing and installing a new mechanical screen and wash press / compactor. New piping and electrical conduit, instruments, and wiring will also be furnished and installed as part of this contract. The Work under the proposed Contract shall commence within 60 days after the date set forth in the Notice to Proceed and shall be completed within 240 days after start of Work. No Bid shall be withdrawn for a period of 90 days after the opening of Bids without consent of Owner. The Owner reserves the right to reject any and all Bids, waive informalities or minor defects in bidding or to accept the Bid or Bids, which best serve the interests of Owner. Bid Security in the amount of not less than 5 percent of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to 100 percent of the Contract Price.

Award

Water / Sewer

$453,450.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Spare Parts, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Fire and Smoke Protection, Applied Fireproofing, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Decorative Finishing
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Monorails
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
247
Bidding Soon
4,757
All Active Projects
1,942
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2021

June 24, 2021

img_map_placeholder

To Be Determined, Branford, CT

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Mechanical Screen Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.