EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Sunbury, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The description and location of the project are as follows: For resurfacing and design and construct of ADA curb ramps including base repairs, milling, Superpave Asphalt Mixture Design scratch and wearing courses, pavement markings, and other miscellaneous construction within an overall length of 3,340.00 linear feet (0.63 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 4010, SECTION 009 from approximately 0.34 miles southeast of the intersection with SR 147 at Segment 0020 Offset 0010 and approximately 0.00 miles northwest of the intersection with State Route 4012 at Segment 0030 Offset 1599 in the CITY OF SUNBURY, NORTHUMBERLAND COUNTY and STATE ROUTE 147, SECTION 119 from approximately 0.76 miles northeast of the intersection with SR 147 and Yeagers Hill Road (T-407) at Segment 0090 Offset 2575 and approximately 0.14 miles southwest of the intersection with SR 147and Toad Valley Road (T- 337) at Segment 0120 Offset 0630 in LOWER MAHANOY TOWNSHIP, NORTHUMBERLAND COUNTY Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: RESURFACING/OVERLAYS 408 Version: 2020-3 PennDOT - SR 4010 from Fourth Street to Eleventh Street

Award

Roads / Highways

$875,791.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Compaction, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
78
Bidding Soon
1,049
All Active Projects
424
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

April 4, 2022

img_map_placeholder

SR 4010, Sunbury, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SR 4010 from Fourth Street to Eleventh Street

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.