EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2021 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a pre-engineered storage facility in Celina, Ohio. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Bids received after 11:00 a.m. will be returned unopened. Bids will be received on a lump sum basis as outlined in the Bid documents. The Storage Building project involves the construction of a 7,200 square foot stick frame storage building with metal exterior wall and roof panels, and metal interior ceiling panels. The building will have a concrete foundation, concrete floor and a 1'-10' high concrete curb wall. Bids must be signed and submitted on the separate bidding forms included in the Bidding Documents, sealed in the provided envelope, Attention of bidders is called to all of the requirements contained in this Bid packet particularly to the State of Ohio prevailing wage rates, various insurance requirements, and various equal employment opportunity provisions. Non-refundable checks are to be payable to Access Engineering Solutions, LLC. BIDS WILL ONLY BE ACCEPTED FROM BIDDERS LISTED ON THE ENGINEER'S OFFICIAL LIST OF PLAN HOLDERS. The Owner reserves the right to reject each and every Bid and to waive informalities, irregularities and errors in the bidding to the extent permitted by law. No bidder may withdraw his Bid within 60 days after the actual date of the opening thereof. Bidder agrees that the work will be substantially completed by November 15, 2021, and shall meet a final completion date of November 30, 2021.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$343,000.00

Public - City

New Construction, Site Work

8

13

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Compaction
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
43
Bidding Soon
792
All Active Projects
324
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2021

June 14, 2021

img_map_placeholder

To Be Determined, Celina, OH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.