BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Laredo, Texas. Completed plans call for the renovation of a educational facility.

This project has been awarded to Leyendecker Construction of Texas in the amount of $28,300. 1.1.0 Contractor must provide all labor, materials, and equipment as required to complete the renovation of room 123 at United Middle School as listed within the scope of work. 1.1.1 Contractor to provide onsite project supervision during working hours. 1.1.2 Use of school facilities (restrooms, break rooms, workrooms, etc.,) will not be permitted. 1.1.3 Contractor to provide trash container and haul all waste generated by project construction off site and legally disposed of once project has concluded. Coordinate placement of container with District. 1.1.4 Remove plywood at south classroom wall and office wall adjacent to classroom and replace with CMU. New CMU is to be primed and painted on both the classroom side and office side. 1.1.5 Contractor to provide and install two 6'x4' marker boards and one 4'x4' tack board. Coordinate exact locations with the District before installing boards. 1.1.6 Contractor is to install existing light fixtures and incorporate light fixtures into new drop ceiling system. 1.1.7 Provide and install all material and labor necessary to install new diffusers, registers, and or grilles as indicated on drawings and incorporate into new ceiling system. Install diffusers, registers, and grilles level and plumb, according to manufacturer's written instructions, Coordination Drawings, original design, and referenced standards. 1.1.8 Contractor is to install existing PA speakers and incorporate speakers on to the new drop ceiling system. 1.1.9 Repair, patch, and fill all existing voids along interior CMU wall as required before priming and painting the wall surface. 1.1.10 Contractor to mount existing light switch by entry door flushed with wall. Repair CMU wall as required. 1.1.11 Contractor must provide all labor, materials, and equipment as required to install a District provided pulldown projector screen. Coordinate exact location with the District before installing the provided screen. Question Cutoff Date: 5/7/2021 03:00 PM (CT)

Award

Educational

$28,300.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
114
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2021

June 2, 2021

img_map_placeholder

700 E Del Mar Blvd, Laredo, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.