BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Saint Louis, Missouri. Design plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 17, 2022, this project is still in planning. An architect has been selected for the project. Construction is estimated to take place between late 2022 to early 2023. *The closed solicitation has been included below for reference Federal Aid No: STP-5602(624) Location: Crestwood, Missouri Proposed Improvement: Remove and replace bridge Length: 0.05 miles Approximate Construction Cost: $1,181,515 DBE Goal Determination: 16% Consultant Services Required: Preparation of conceptual, preliminary, and final bridge design. Other Comments: Design for 2021-2022. Construction 2022-2023. Contact: Name: James E. Gillam Address: 1 Detjen Drive, Crestwood, MO 63126 Phone: (314)729-4722 Email: jgillam@cityofcrestwood.org The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Whitecliff Park Lane, Remove and Replace Bridge

Design

Bridges / Tunnels

$1,181,515.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
38
Bidding Soon
783
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2022

img_map_placeholder

Whitecliff Ln, Saint Louis, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.