BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Saint Louis, Missouri. Completed plans call for site work for a water / sewer project.

Great Rivers Greenway District (the District), is a multi-jurisdictional political subdivision including the City of St. Louis, St. Louis County and St. Charles County. The primary purpose of the District is to improve the quality of life throughout the St. Louis region by developing a public system of interconnected greenways, trails and parks. The District is seeking bids for installation of new piping to existing bridge deck drain in St. Louis, MO. Questions regarding this bid are to be sent via email no later than July 21, 2022 at 5:00 p.m. prevailing central time to Ben Grossman, Director of Greenway Operations at bgrossman@grgstl.org. Responses shall be issued no later than July 25, 2022 to all known plan holders who provided information when downloading the bid packet from the District website. It is the policy of the District that minority and women-owned businesses shall have the maximum opportunity to participate in the performances of contracts utilizing District funds. While not a requirement, the District has established Minority and Women Business Enterprise goals of 25/5% i.e. 25% of the total contract amount to be awarded to Minority Business Enterprises (MBE) and 5% of the total contract amount to be awarded to Women Business Enterprise (WBE). It is the prospective firms responsibility to make a sufficient portion of the work available to sub-contractors to meet the goal, consistent with the availability and capacities of MBE and WBE firms. MBE/WBE firms, if included in the submittal, either as general contractor or sub-contractors, must be certified by one or more of the follow agencies on or before the date of the submission of qualifications: Missouri Division of Purchasing and Materials Management City of St. Louis: Disadvantage Business Enterprise Program St. Louis Minority Business Council Contractor to provide all labor, materials, equipment and permits necessary to install a new drainpipe to existing bridge (Trestle) deck drain and route drain to allow water to spill onto existing grade. Drainpipe to be adequately secured to the structure. Previous deck drain was removed, therefore no demolition or removal required. New drain to be installed to existing stub out on the underside of the deck. Drain is located in the Old North St. Louis Neighborhood at the intersection of 11 th Street and Tyler Street, St. Louis, MO 63106. All work to comply with City of St. Louis Building Department requirements for plumbing work.

Bid Results

Water / Sewer

$7,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
80
Bidding Soon
1,286
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2022

August 29, 2022

Project location map

11th Street and Tyler Street, Saint Louis, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.