BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Temecula, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include: Roadway rehabilitation of the full width of Pauba Road approximately from Margarita Road to Butterfield Stage Road, and the full width of Butterfield Stage Road from 405 feet south of De Portola Road to 230 feet south of Rancho California Road. The roadway rehabilitation shall generally consist of 2 to 3 inches of cold milling and placement of 2 to 3 inches of asphalt concrete. The project also includes the removal and replacement of existing roadway striping, pavement markings, and traffic signal loops, the removal and reconstruction of existing pedestrian ramps in order to comply with current ADA standards, and adjustment of existing utilities to grade. The Contractor and all subcontractors for the Work shall comply with all applicable Federal, State, Riverside County, and City of Temecula statutes, regulations, orders, and ordinances. This requirement specifically includes, without limitation, compliance with the "Safety and Health Guidance COVID-19 Infection Prevention in Construction" issued by the California Department of Industrial Relations, Division of Occupational Safety and Health and Safety on July 20, 2020 and as may be amended from time to time by the Department, relating to mitigating the transmission of COVID-19 on the project site and mitigating the transmission of COVID-19 by employees or workers of Contractor and its subcontractors in their contacts with City employees and consultants. Prior to the pre-construction meeting, the Contractor shall submit to the City a "COVID-19 Mitigation Program" implementing these requirements and shall post the COVID-19 Mitigation Program on the project site in a manner designated by the City's Project Manager. The failure of employees or workers of the Contractor and all subcontractors on the Work to comply with these requirements shall be a default per Section 6-7.1. Contractor acknowledges that, in the event that the Engineer suspends the Work as a result of such failure by Contractor or one of its subcontractors to comply with these requirements, City is not responsible for the delay, and the Contractor is not entitled to compensation pursuant to Section 6-4.3. The Contractor shall also pay to the City the costs and expenses incurred by the City resulting from the failure of employees of the Contractor and all subcontractors on the Work to comply with these requirements including, but not limited to, the salaries and benefits for City employees who are unable to work, and workers compensation benefits and expenses. Delays in the Work resulting from Contractor's or its subcontractor's failure to comply with these regulations shall not be considered an unforeseen event entitling Contractor to an extension of time or payment for delay pursuant to Section 6-4 of the Standard Specifications. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No Contractor or subcontractor may be awarded a contract for public work unless registered with the DIR pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring & enforcement by the DIR. Response Types Line Items Bid Bond Type of Award Lump Sum License Requirements A or C-12 Liquidated Damages $1,000 per calendar day Project Duration 144 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 05/25/2021 2:00 PM (PDT)

Award

Roads / Highways

$2,733,770.00

Public - City

Paving, Site Work

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
107
Bidding Soon
2,375
All Active Projects
943
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2021

August 2, 2021

img_map_placeholder

Multiple Locations, Temecula, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.