BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2023 at 7:00 PM

Updated October 14, 2025

Site work for a road / highway in Red Deer, Alberta. Completed plans call for site work for a road / highway.

As of January 16,2023, This project has been awarded to Pidherney's Inc, with the awarded amount of $19,794,049.68. This project consists of four major components. The first component of the work includes the reconstruction of 19 Street. The asphalt along 19 Street is in poor condition and the City of Red Deer will be reconstructing 19 Street between Gaetz Avenue and Irwin Avenue. The new pavement structure is deeper than the existing pavement structure and the existing curb and gutter will mostly remain in place, with all pinned on curb being replaced with curb and gutter. The construction will be in close proximity to two wetland areas, where a subdrain will be installed along the bottom of the excavation to convey groundwater to the storm sewer system. The second component of the work includes reconstructing the intersection of 19 Street with 40 Avenue as a multi-lane roundabout. The roundabout will have a concrete pavement surface. The ancillary work at the intersection includes salvaging the existing traffic signals, relocation of existing streetlights and the installation of new streetlights, the burial of an overhead power line, the installation of Rectangular Rapid Flashing Beacons (RRFB), storm sewer relocation, and subdrains. The third component of the work is the construction of an asphalt multi-use trail along the north side of 19 Street from Piper Creek to 40 Avenue. The fourth and provisional component of the work is the construction of a right in/right out access from 40 Avenue to the Living Stones Church. The work will include the construction of a right in/right out access, a northbound left turn bay, saw cutting and removal of a portion of the existing asphalt access road, construction of a new sound attenuation berm, and landscaping along the berm. Documents can be obtained from https://reddeer.bidsandtenders.ca/ Question Deadline: Fri Dec 2, 2022 1:30:00 PM (MST)

Award

Roads / Highways

$19,794,049.00

Public - City

Site Work

68

9

14

5

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
0
Bidding Soon
150
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2022

February 21, 2023

Project location map

Multiple Locations, Red Deer, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.