BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tulsa, Oklahoma. Completed plans call for the renovation of a educational facility.

For Jenks East Intermediate Building a Re-roof Construction Start Date: Thursday, May 30, 202 Construction Completion: Tuesday, August 1, 2023 The bidding process will be in compliance with the Public Competitive Bidding Act of 1974. Bids must be accompanied by a bid security in the amount of 5% of the bid. By this notice, all provisions of the act apply to this project and are incorporated into notice by reference. Contractor qualification statement must be submitted with Bid. Attention is called to the fact that a designated completion date for the project shall be established based upon Calendar Days to Complete provided by the Bidder. There shall be a $500 Liquidated Damages Clause for each day the contract is not completed. Failure to comply with the above bid requirements will result in return of unopened Bid Proposal. All printing costs are the responsibility of the bidder. Bid Documents may be reviewed at the following locations: Southwest Construction News Data & Analytics Construct Connect Owner reserves the right to reject any or all bids and to waive informalities or minor irregularities in any bid. If the Contract Price is in excess of $100,000.00, Contractor will furnish the following bonds: (i) a Payment Bond (the "statutory" bond required by Section I of Title 6 1, Okla. State, as amended) in an amount equal to 100% of the Contract Price; and (ii) a Performance Bond in such form as directed by Owner in an amount equal to 100% of the Contract Price for work on the project(s) as security for the proper and prompt completion of the Work in accordance with the contract and bidding documents; and (iii) a Warranty Bond in an amount equal to 100% of the Contract Price for work on the project(s) to protect Owner against defects in workmanship and materials for a period of one (1) year from Owner's acceptance of the Project(s); or (iv) a Letter of Eligibility notarized by the bonding company verifying the ability of the Contractor to be bonded for the total amount of the project as specified in the project manual. The Surety on all bonds of the successful bidder must be approved in the Treasury Department Circular 570. If the Surety Company is not on the list, those bids shall be rejected.

Award

Educational

$517,000.00

Public - City

Renovation

16

10

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
75
Bidding Soon
679
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

May 30, 2023

img_map_placeholder

3933 E 91st St, Tulsa, OK

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.