Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Summit Township, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The proposed work includes: Construction of a 90 foot single span prestressed concrete NU-girder bridge, approach roadway work, and any incidental work in accordance with the plans and specifications. The project is located on County Road 4003, in Section 29, Township 40 N, Range 30 W, Bates County, Missouri, over Root Branch. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the United States Department of Labor (Federal Wage Rate), or by the Missouri Department of Labor and Industrial Relations (State Wage Rate), whichever is higher. The Bates County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2020 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Contractors and sub-contractors who sign a contract to work on public works projects shall provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The Bates County Commission reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. No 2nd tier subcontracting will be allowed on this project. MoDOT - Bates County Bridge Replacement

Post-Bid

Bridges / Tunnels

$700,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
74
Bidding Soon
1,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2022

April 28, 2022

Project location map

NE County Rd 4003, Summit Township, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed