Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 26, 2024 at 8:00 PM

Updated September 27, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Summit Township, Missouri. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

City/County - Bates County Location: NE County Rd 13004 Bridge #1260012 over Elk Fork Length: Project length approx 550 ft Proposed Improvement: Bridge replacement and associated road work The method of Contractor Selection has not been Determined at this time. MODOT - RFQ Engineering - Bridge Replacement and Associated Road Work

Conceptual

Bridges / Tunnels

$600,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
74
Bidding Soon
1,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2025

Project location map

NE County Rd, Summit Township, MO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed