Site work and paving for a civil project in Orono, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Work under this project consists sanitary sewer and roadway improvements including of lining of 3300 LF of 8" sanitary sewer, replacement of 11 manholes and 1000 LF of sewer services, full depth reclaiming of 6800 SY of roadway, replacement of 1200 LF of storm drain and 2 catch basins, 1800 tons of pavement, and all materials, labor and equipment required to complete roadway reconstruction on Mountainview Drive, Erin Place, Frost Lane, and Edgewood Drive. The project must be substantially completed within 150 consecutive calendar days and complete within 180 calendar days after the execution of Notice to Proceed. A certified check or bank draft payable to the Owner or a satisfactory Bid Bond executed by the Bidder and Surety Company in an amount equal to five percent (5%) of the Bid shall be submitted with each bid. No bid may be withdrawn for at least 90 days after receipt of bids unless released by Owner. Plans and Specifications are on file and may be examined at the following locations: Olver Associates Inc. Orono Municipal Building 290 Main Street 59 Main Street Winterport, Maine 04496 Orono, Maine 04473 Those wishing to view plans at the Town office must do so by appointment by emailing ryerxa@orono.org or jmadigan@orono.org. The Contractor must comply with the Disadvantaged Business Enterprises (DBE) SRF special requirements contained in the CWSRF Supplementary Conditions. Failure of the successful Bidder to complete the pre-award requirements of this program may result in finding that the Bidder is non-responsive and therefore not entitled to award of this contract. This contract is expected to be funded by a State Revolving Loan and DECD/CDBG grant. Neither the State of Maine nor any of its departments, agencies, or employees is or will be a party to this Agreement. The word "AGENCY" in the standard general conditions and the Owner-Contractor agreement refers to the Maine Department of Environmental Protection (DEP). The Contractor must comply with Davis-Bacon and Davis-Bacon Related Acts as stated in the Supplementary Conditions. All laborers and mechanics employed by the contractor and subcontractors on this project shall not be paid less than the prevailing wage rates contained in the wage determination published in the bidding documents. Any laborers and mechanics not listed in the wage determination shall be paid at least as much as the lowest wage rate for other similar trade classifications already contained in the wage determination published in the bidding documents. The Contractor shall comply with the Use of American Iron and Steel in accordance with Public Law 113-76, Section 436. The law and its requirements and guidance, including certification forms, can be found in the SRF supplementary conditions. The Contractor Compliance Certification included in Attachment N must be completed and submitted with each payment indicating that all required materials have been purchased in compliance with Use of American Iron and Steel Law provisions or an applicable waiver has been obtained. The Contractor and subcontractors shall use the Elation systems software, made available by the State of Maine Department of Environmental Protection, for uploading their weekly certified payroll. Payroll noncompliance and other related payroll issues identified by the software shall be resolved by the contractor/subcontractor in the software and in a timely manner to maintain compliance with Davis Bacon requirements throughout the project. The Owner reserves the right to reject any or all bids, to accept any bid that it deems to be in its best interests, and to waive any irregularities in bidding
Award
Roads / Highways
$1,211,460.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2021
July 30, 2021
Multiple Locations, Orono, ME
Related To This Project
Orono, ME
Bid Date: Aug 28 2023
Orono, ME
Bid Date: Nov 17 2023
Orono, ME
--
Orono, ME
Bid Date: Jun 09 2021
Orono, ME
Bid Date: Feb 22 2022
Orono, ME
Bid Date: Feb 17 2022
Orono, ME
Bid Date: Aug 17 2023
Orono, ME
Bid Date: Aug 02 2023
Orono, ME
Bid Date: Jul 06 2023
Orono, ME
Bid Date: Jun 22 2023
Orono, ME
Bid Date: Jun 16 2023
Orono, ME
Bid Date: Jun 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.