Site work for a water / sewer project in Beacon, New York. Completed plans call for site work for a water / sewer project.

**As of June 29, 2022, project was awarded to Doyle Contracting, awarded amount is 2,161,140 for Mount Beacon Reservoir and $597,200 for Pocket Dam Rehabilitation ** For Pocket Dam, the Contractor shall: remove 1-foot of concrete and then raise the non-overflow section to EL. 429.2' and replace the foot of concrete to the spillway. The Contractor will remove the remaining deteriorated concrete from the downstream face, clear debris from the downstream channel and repoint the downstream face of the dam. The Contractor will add (2) electrical conduits into the concrete from the pump house to the new valve platform. The Contractor will add 1.5 feet of concrete to the upstream surface of the entire dam, tying into bedrock. A fall protection system will be installed, and valve operating platform will be replaced by the Contractor. Lastly, the Contractor will raise & replace the pump house door and remove and replace fencing. For Mount Beacon Reservoir Dam, the Contractor will remove all shotcrete and loose or deteriorated concrete to/from the downstream face and crest of the dam, spillway, training walls and buttresses down to the base of the entire dam. The Contractor will remove shotcrete along the downstream face and crest of the spillway and from the upstream face down to EL. 1282.0'. The Contractor will remove the south spillway channel wall connecting to the gatehouse and install drainage channels and piping in the downstream face to connect the existing drainage pipes to the new draining system at the toe of the dam. The Contractor will remove the deteriorated buttresses to a depth of 1 foot below existing ground surface and prepare for shotcrete layer along the downstream face. The Contractor will route the piping for the drainage system to run to a new weir box and then through the northern most spillway channel wall before the culvert under the access road. The Contractor will raise the non-overflow sections to EL. 1288.5', build a new spillway channel wall to the gatehouse, remove and install a new valve platform. The Contractor will install a new handrail protection system, extend the dam 19 feet on the southern end and 22 feet on the northern end, excavate the gatehouse floor and remove the existing downstream 18-inch gate valve. The Contractor will install (2) new pipe saddles, install a new 18-inch butterfly valve with extended bonnet and install a new removable steel platform floor in the gatehouse. A new shotcrete surface layer will be placed on all spillway channel walls and the downstream face of the dam. The Contractor will install a new 8-inch tap on the 18-inch C.I.P. before the gate house and install piping to a 4-foot diameter manhole that will contain a flow meter. The Contractor will then install piping with the discharge passing through the spillway channel wall just north of the gatehouse. The City of Beacon reserves the right to waive any informalities, and/or to reject any or all bids. The City will not discriminate against bidders because of race, creed, color, national origin, sex, age, disability or marital status. Each bidder must deposit with his bid security in the proper amount and form, as described and provided in the Information to Bidders and Non-Collusive Certificate. The Addenda, if any will be issued only to those persons whose name and address are on the record as having obtained the contract documents. Bids will be accepted from only those persons whose name and address are on the record as having obtained contract documents. Buyers Requirements General Requirements - Insurance Required - Prevailing Wage Required - Certification/Training - Certified Payroll Question Acceptance Deadline 05/05/2022 10:00 AM EDT Questions are submitted online No

Award

Water / Sewer

$2,758,340.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Acoustic Treatment, Acoustic Wall Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
529
Active Projects
300
Bidding Soon
4,703
All Active Projects
2,242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

img_map_placeholder

Pocket Rd, Beacon, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mount Beacon Reservoir and Pocket Dam Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.