BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2021 at 8:00 PM

Updated June 17, 2025

Site work and paving for a mixed-use development in Waukesha, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of 06/23/2021 Awarded with $65,146.40 1. Scope:Crack Filling - The Contractors Work under this Contract shall include all labor, materials, tools, equipment and related items necessary to install crack fill as shown on the Drawings and as specified herein. This Work includes cleaning, drying and filling the longitudinal and transverse cracks in asphaltic pavement. Crack filling shall take place prior to striping. Striping - The Contractors Work under this Contract shall consist of furnishing all labor, materials and equipment necessary for pavement striping and marking as herein specified and for the sections shown on attached Drawings and as per State of Wisconsin Department of Transportation Standard Specifications for Highway and Structure Construction Section 646. Striping of roads includes all pavement markings on designated section and may include: center lines, stop lines, direction arrows, parking lot stalls, accessible stall, hatching, curb markings and pavement lettering. Striping of parking lots includes all pavement markings on designated section and may include: stop lines, parking lot stalls, accessible stalls, hatching, curb markings and pavement lettering. All pavement marking shall comply with Waukesha County standard paving colors unless directed by the County Landscape Architect. Standard Colors: Parking Lot Stall Lines - white, Accessible Symbols - blue and white, Parking Lot Hatching - white, Directional Arrows - white, Pavement Lettering - white, Crosswalk Bar - reflective white paint, Center Lines - bright yellow, Curb Marking (no parking) - bright yellow, Epoxy Crosswalk Bar - white epoxy. 4. A Pre-Bid meeting is not scheduled for this project. 5. Bidders and sub-Bidders requiring clarification or interpretation of the Bid documents shall submit a written request to Waukesha County Guest Services at parksinfo@waukeshacounty. gov no later than 10:00 a.m. on May 27, 2021.

Award

Roads / Highways

$65,146.00

Public - County

Paving, Site Work

8

6

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
229
Bidding Soon
2,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2021

June 7, 2021

Project location map

Multiple Locations, Waukesha, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.