BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Quincy, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Removing asphalt concrete pavement, roadway excavation, pigmented cement concrete pavement, planing bituminous pavement, hot mix asphalt, seeding and mulching, round about items, illumination system, pavement markings, traffic control and other work. 46 working days. Estimated value $2,000,000 - $2,500,000 WSDOT - SR 28/White Trail Rd - Roundabout *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Contract provides for the improvement of *** SR 28 MP 25.52 to MP 25.92 in Grant County, SR 28/White Trail Rd- Roundabout, by Clearing and Grubbing, Removal of Structures and Obstructions, Removing Asphalt Conc. Pavement, Removing Miscellaneous Traffic Item, Removing Monument Case, Cover, and Pipe, Roadway Excavation Incl. Haul, Common Borrow Incl. Haul, Embankment Compaction, Quarry Spalls, CL. V Reinf. Conc. Culv. Pipe 12 In. Diam., Catch Basin Type 1, Testing Storm Sewer Pipe, Schedule A Storm Sewer Pipe 12 In. Diam., Crushed Surfacing Base Course, Pigmented Cement Concrete Pavement,Corrosion Resistant Dowel Bar, Planing Bituminous Pavement, HMA Cl. 3/8 In. PG 64V-28,Commercial HMA, ESC Lead, Erosion/Water Pollution Control, Tackifier, Seeding and Mulching, Medium Compost, Project Area Weed and Pest Control, High Visibility Fence, Roundabout Splitter Island Nosing Curb, Roundabout Cement Concrete Curb and Gutter, Roundabout Central Island Cement Concrete Curb, Modified Truck Apron Cement Conc. Curb and Gutter, Cement Conc. Pedestrian Curb, Transportable Attenuator, Repair Transportable Attenuator, Flexible Guide Post, Tubular Marker, Plastic 12 Inch Wide Line, Grooved Plastic Line, Shoulder Rumble Strip Type 2, Permanent Signing, Temporary Pavement Marking- Short Duration, Illumination System No. 1 & 2, Portable Temporary Traffic Control Signal, Sequential Arrow Sign, Portable Changeable Message Sign, Flaggers, Other Traffic Control Labor, Traffic Control Supervisor, Construction Signs Class A, Plastic Wide Line, Shoring Curb Ramp Type Parallel A, Asphalt Curb Ramp, Detectable Warning Surface, Pigmented Cement Concrete Buffer, Adjust Cable Vault, SPCC Plan, Construction Geotextile for Permanent Erosion Control MBE (7.2%), WBE (6.9%) Job no- 23B003/3

Award

Roads / Highways

$1,819,998.00

Public - State/Provincial

Paving, Site Work

142

6

4

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
13
Bidding Soon
124
All Active Projects
55
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

April 10, 2023

img_map_placeholder

WA-28 & White Trail Rd, Quincy, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.