BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Amalga, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Contract Award Date: Jan 18, 2022 Contract Award Number: 6982AF22C000011 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 024945706 Contractor Awarded Unique Entity ID (SAM): TVQ6LPR967V7 Contractor Awarded Name: Staker & Parson Companies Contractor Awarded Address: Ogden, UT 84409-3481 USA Base and All Options Value (Total Contract Value): $4778254.00 THIS PROJECT WILL BE ADVERTISED AS FULL AND OPEN THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: UT FLAP 218(1) PROJECT NAME : Sheep Creek Loop PROJECT DESCRIPTION: The UT FLAP 218(1), Sheep Creek Geologic Loop Project is located on Highway 218 approximately 7 miles south of Manila, UT in Northeast Utah. The project crosses through private and Ashley National Forest (USFS) Lands, providing access to the Flaming Gorge-Uintas National Scenic Byway. The route is categorized as a rural recreational and scenic roadway in level terrain and is maintained by Dagget County. This project proposes reconstruction, widening, minor profile adjustments, guardrail replacement, and drainage improvements of 1.85 miles of roadway on the Sheep Creek Geologic Loop. Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including a concrete box culvert), cattleguard installation, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated or reconstructed. SIGNIFICANT QUANTITIES (Schedule A): 20401-0000 Roadway Excavation: 4,600 CUYD 20403-0000 Unclassified Borrow: 1,050 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,700 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,800 TON 60222-1800 8 Feet Span, 4 Feet Rise Reinforced Concrete Box Culvert, Double Barrel: 40 LNFT MISCELLANEOUS: Weekday road closures to public traffic will be allowed during a large portion of the construction activities. Access through the closure to USFS permit holders and local property owners will be required at all times. For all other work, construction-caused delays to public traffic will be limited to a maximum of 30 minutes per passage through the project. Perform pre-construction nesting bird survey within 7 days before vegetation removal performed prior to August 1. Due to weather restrictions, on-site construction typically cannot occur until March. Seeding must take place between the dates of September 15 and November 15. COST RANGE: The proposed project is estimated at a cost between $2,500,000 and $3,500,000. CONSTRUCTION DURATION: Construction is anticipated from March 2022 to September 2022. ADDITIONAL INFORMATION: Anticipated Advertisement: Late October 2021 Anticipated Bid Opening: Late November 2021 Anticipated Award: Mid December 2021 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$4,778,254.00

Public - Federal

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
20
Bidding Soon
302
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

January 19, 2022

img_map_placeholder

UT-218, Amalga, UT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.