BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 8, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Pontiac, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Job Location Pontiac, MI Question Acceptance Deadline 06/01/2021 05:00 PM EDT Questions are submitted online Yes The City of Pontiac is requesting bids for improvements to the Clinton River Trail beginning at Pontiac Drive in Bloomfield Township and ending at Bagley Street in the City of Pontiac. Approximately 1.75 miles of a shared use path will be improved by resurfacing the existing aggregate surface with additional compacted limestone fines to be 10' wide with 2' shoulder areas in accordance with current AASHTO standards. The project also includes striping and signage at all intersections, bollard removal and replacement, a High-Intensity Activated Crosswalk Beacon (HAWK) installation at the Orchard Lake Road crossing, wooden railing replacement at two existing bridges over the Clinton River, and ADA ramp improvements. Other items of work include soil erosion control, landscaping improvements, and maintenance of traffic.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
128
Bidding Soon
2,383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

August 9, 2021

Project location map

Clinton River Trail, Pontiac, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.