BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a road / highway in Charlotte, North Carolina. Completed plans call for the construction of a road / highway; and for site work for a road / highway.

Charlotte Water (CLTWater) is seeking Progressive Design-Build services to assist with the analysis, design and construction of the Mallard Creek Interceptor Improvement Project - Phase 1 and 2 (Project). Proposers need to assemble a team of experts including at a design, survey, geotechnical, environmental, permitting, pre/post blasting surveys and related seismic monitoring, real estate acquisition including appraisal and legal, and communication experts and construction contractors. The Mallard Creek Basin service area consists mainly of residential zoning, with increasing commercial development around the new Blue Line Extension, UNC Charlotte, and the University Research Park. Infrastructure improvements are needed, not only to support current flows and maintain required service levels within the Mallard Creek Basin, but to also keep pace with the rapid growth and development. Hydraulic modelling conducted for the Mallard Creek Basin indicated that the Mallard Creek interceptor is currently capacity limited under two-year peak flow conditions. Future population and flow projections further suggested that flows in the basin would likely grow about 20 percent every 10 years. Per Charlotte Water's Capacity Assurance Program (CAP), for the purposes of accepting new connections, adequate capacity exists when the sanitary sewer system can convey flows at a 2-year Level of Service (LOS) between the point of connection and the wastewater treatment plant without excessive surcharge, while future enhancements are sized for the 10-year peak flow condition. Notice to Proceed September, 2021 Preliminary Engineering Phase 1 & 2 April 2022 60% Design GMP Submittal - Phase 1 September 2022 GMP Submittal - Phase 2 TBD Easements Acquisition (Phase 1 and 2) September 2023 Final Design (Phase 1 and 2) April 2023 Phase 1 Construction Start (NTP) May 2023 Phase 1 Construction Substantial Completion May 2025 The anticipated budget for the Project is as followed: * Targeted Rehabilitation Construction (CLT Water will provide construction documents): $300,000 * Phase 1 Design and Construction: $57,700,000 * Phase 2 Design and Construction: $35,600,000 Last Day for Questions June 4, 2021 at 5:00 PM Selection Notification June 23 - June 29, 2021 Finalize Preconstruction Scope and Fee June 30, 2021 Recommendation to Council August 9, 2021 Proposers may submit written questions concerning this RFQ to Katherine Osborne via email at katherine.osborne@charlottenc.gov. Questions received after the stated deadline in the Schedule of Events will not be answered. Proposers are encouraged to contact the Charlotte Business INClusion (CBI) Liaison for assistance or clarification with issues specifically related to the City's CBI Program. The point of contact is Frederica Love, who may be reached via email at flove@charlottenc.gov. Please contact the owner for bidding documents. Appraisers will conduct a site visit to inspect the property. The Appraisal firm will make every reasonable effort to contact the property owner prior to site inspection. The appraisal company must allow the property owner or representative to accompany the appraiser on the site inspection. The appraisal company is required to document their efforts to reach the property owner or representative. If the property owner or representative does not accompany the appraiser on the site inspection, the appraisal company must document the reason. As of 8/9/21, no award has been made for this project.

Post-Bid

Roads / Highways

$93,300,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
60
Bidding Soon
1,160
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2021

May 1, 2023

img_map_placeholder

To Be Determined, Charlotte, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.