Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2021 at 8:00 PM

Updated February 9, 2024

Demolition and site work for a mixed-use development in Mobile, Alabama. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The work consists principally of providing bonds, labor, materials, equipment, and supervision necessary for the removal and disposal of: existing building components that contain asbestos or other hazardous materials, steel, concrete structures, masonry structures, equipment, utilities, foundations, slabs and backfilling of tunnels and basements in accordance with the project plans and specifications. The Contractor will be required to complete the work under the Contract within 200 calendar days of the effective date of "Notice to Proceed". All bidding Contractors must hold the proper license from the State Licensing Board of General Contractors, Montgomery, Alabama. Specifications, proposal forms, bid and performance bond forms, and plans are on file in the office of Technical Services Department, Alabama State Port Authority, Mobile, Alabama. For additional project specific information, please contact the Project Manager, Pete Olivero at (251) 622-2688 (e-mail to polivero@asdd.com). This shall include evidence of holding a current license as required from the State Licensing Board for General Contractors, Montgomery, Alabama with the classification being appropriate for this type of work. In addition, non-residents of the State must show evidence of having qualified with the Secretary of State to do business in AL. The right is reserved, as the interest of the Alabama State Port Authority may require, to reject any and all bids and to waive informalities in bids received. The Contractor will be required to complete the work under the Contract within 240 calendar days of the effective date of Notice to Proceed

Award

Municipal

$400,000.00

Public - State/Provincial

Demolition, Site Work

3

6

10

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
75
Bidding Soon
1,005
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2021

June 24, 2021

Project location map

To Be Determined, Mobile, AL


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed