BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2021 at 8:00 PM

Updated November 15, 2023

Renovation of a municipal facility in Webster City, Iowa. Working plans call for the renovation of a municipal facility.

The project has been cancelled as per adda 4 The extent of the work involved for 2021 WILSON BREWER COURTHOUSE STRUCTURAL IMPROVEMENT PROJECT consist of the following work: 1. Reconstruction of load bearing walls. 2. Construction of new basement and second floor accesses. 3. Replacement of north entry doors. 4. Installation of new heating and ventilation and sump pump equipment. 5. Installation of new interior lighting. 6. Installation of new interior storm windows. 7. Paint and caulk exterior siding and trim. 8. Replacement of selected siding and trim. 9. Refinishing first and second level floors. 10. Install window wells and minor site grading. 11. Construct concrete sidewalk to basement access. 12. Roof rafter repairs.

Final Planning

Municipal

$146,000.00

Public - City

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
97
Bidding Soon
1,158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2021

September 1, 2021

Project location map

To Be Determined, Webster City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.