EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 3, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a transportation facility in Pittsburgh, Pennsylvania. Completed plans call for site work for a transportation facility.

**As of September 01, 2021, project has not been awarded. Any questions shall be direct to David Hart at (412) 566-5415 or dhart@portauthority.org Estimated cost is in excess of $20,000,000.00 Each Bidder shall be solely responsible for assuring that its Bid is both received and time stamped by a representative of the Purchasing and Materials Management Department at or before the advertised time for submission of Bids. Bidders submitting bids via FedEx, UPS, USPS or other carrier must immediately provide tracking information to the assigned contract specialist via e-mail. Upon delivery, bidder will notify the assigned contract specialist with an e-mailed receipt. Bids received or time stamped in the Purchasing and Materials Management Department after the advertised time for the submission of Bids shall be non-responsive and therefore ineligible for Award. The Work of this Project includes, but is not limited to, the furnishing of all supervision, labor, material, tools, equipment and incidentals necessary to: rehabilitate the reinforced concrete track plinths, remove and replace direct fixation (DF) plates, anchors and hardware, reinstall track to defined horizontal and vertical alignment, Wood Street Station platform adjustments, survey, and maintenance and protection of Authority Light Rail traffic. The Authority will supply the DF plates and hardware, excluding shims, for Contractor installation. Additionally, the Contract contains a Bid Option to furnish of all supervision, labor, material, tools, equipment and incidentals necessary, but not limited to, design, procure and replace the Special Trackwork DF Plates for the Gateway and Steel Plaza locations (Bid Option). Bid Documents will be available for public inspection and may be obtained at Authority's offices at the following address (If you are picking up bid documents, please call David Hart at (412) 566-5415 prior to arriving at this location - all participants must provide and wear a mask at all times and practice minimum social distancing of 6 feet between other individuals): Port Authority of Allegheny County Purchasing and Materials Management Department Heinz 57 Center 345 Sixth Avenue, Third Floor Pittsburgh, Pennsylvania 15222-2527 Should the purchaser wish to have the Bid Documents delivered via special delivery, such as UPS or Federal Express, the purchaser shall provide its appropriate account numbers for such special delivery methods. This Project may be funded, in part, by, and subject to certain requirements of, the County of Allegheny and/or the Commonwealth of Pennsylvania. Authority, in compliance with 74 Pa.C.S. 303, as may be amended, require that certified Diverse Businesses (DBs) have the maximum opportunity to participate in the performance of contracts and subcontracts for this Project. In this regard, all Bidders shall make good faith efforts in accordance with 74 Pa.C.S. 303, to ensure that DBs have the maximum opportunity to compete for and perform contracts. Bidders shall also not discriminate on the basis of race, color, religion, creed, age, disability, national origin, sexual origin, gender identity or status as a parent in the award and performance of contracts for this Project. If aid is required to involve DBs in the Work, Bidders are to contact Authority's Director of Employee Relations and OEO at (412) 566-5262. The Bidder's attention is directed to the following contacts for Bidder's questions: Procedural Questions Regarding Bidding: David Hart - Authority (412) 566-5415 email: Dhart@Portauthority.org All other questions relating to the Bid Documents must be submitted by mail or email to: Port Authority of Allegheny County Heinz 57 Center 345 Sixth Avenue, Third Floor Pittsburgh, PA 15222-2527 Attn: David Hart email: Dhart@Portauthority.org Authority reserves the right to reject any or all Bids ARTICLE 2 PRE-BID CONFERENCE A Pre-Bid Conference may be held with prospective Bidders to review the Bid Documents and generally discuss the Project. The time and place will be specified in the Advertisement. All Bidders are encouraged to submit their questions in writing to the respective individuals listed in the Advertisement prior to the time specified in the Advertisement for the Pre-Bid Conference. A response may be provided during the Pre-Bid Conference or by Addendum thereafter. ARTICLE 3 PRE-BID TOUR If a site tour is to be conducted covering the area(s) of the Work, it will be held at the date and time indicated in the Advertisement. ARTICLE 4 PUBLIC OPENING OF BIDS Bids will be publicly opened and announced at the advertised time and place set for such Bid opening. Last day for questions is Monday, June 21, 2021. The period for questions has been reopened and extended until Monday, June 28, 2021.

Award

Transportation Terminals

$19,280,546.00

Public - County

Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Paver Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Drilled Caissons, Caissons, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks, Special Trackwork, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway Construction and Equipment, Waterway Scour Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
64
Bidding Soon
1,012
All Active Projects
453
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2021

September 6, 2021

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Tunnel Plinth Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.