BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of an educational facility in Douglas, Arizona. Completed plans call for the construction of a primary / secondary education facility.

As November 16, 2022, of construction is underway. A timeline for completion has not been confirmed. Demolition and new construction of 4 PEMB (metal buildings) with complete interior finishes, MPE, fire protection and site improvements. The scope includes: 1. Site Demolition; Athletics Areas, Trees, Fence, Ball Fields, Dugouts, Sidewalk; see drawing AS1.2. 2. Building Demolition and all Systems. 3. Concrete Foundations, Slab on Grade, Curb, Ramp, Steps and Sidewalk. 4. Precast Concrete Bollards. 5. PEMB, Pre-engineered Metal Buildings noted as R, S, T and V. 6. Steel Bollards, Gates, Rails, Fence and Goal Posts; see drawing AS2.1. 7. Metal Framed Interior Walls, Batt Insulation and Drywall. 8. Millwork and Counters 9. Metal Wall Panels, Air Barrier and Roof Panels 10. HM Doors, Frames, Wood Doors, Hardware. 11. Storefront, Windows, Doors and Insulated Solarban Z50 Glass 12. Interior Finishes, Tile, LVT, Base, Sealed Concrete, ACT Ceilings 13. Fiber Cement Siding Panels. 14. EIFS over 1 ½” Expanded Polystyrene over 5/8” Gypsum Board. 15. Painting Walls and Ceilings. 16. Toilet Room Accessories, Fire Extinguishers and Cabinets. 17. Food Service Equipment. 18. Wet-Pipe Fire Sprinklers System. 19. Plumbing Fixtures, Piping, Equipment. 20. Mech Scope; Exhaust, Air Handler Units, Ducts. 21. Electrical Scope including, Panels, Gear, Devices, Wire, Interior & Exterior Light Fixtures. 22. Telecommunications. 23. Addressable Fire Alarm. 24. Grading, Over-ex and Re-compaction, Utilities, SWPPP 25. Site Furnishings, Benches and Trash Receptacles and Equipment; per drawings. 26. Baseball Field, Chain Link Backstop, Discus Circle, Shot Put Area and Javelin Runway. Alternate 1 – Paving of North Parking Lot Alternate 2 – Paving of Bus Lane, Fire Lane and Plaza Alternate 3 – Entry Tensile Fabric Canopy *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Educational

$23,000,000.00

Public - City

New Construction

1

2

35

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
40
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2021

June 22, 2021

img_map_placeholder

1500 15th St, Douglas, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.