BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated October 24, 2023

Site work and new construction of an educational facility in Douglas, Arizona. Completed plans call for the construction of a 53,000-square-foot educational facility; and for site work for a educational facility.

It is estimated the cost of construction for both components of the FRAP will range from $10,500,000 to $14,200,000. It is Cochise College's intent to complete a multi-component First Responders Academy Project (FRAP), which includes the renovation of a residence hall and new construction of the first responder's academy building on the Douglas Campus. The residence hall renovation accounts for approximately 23,000 square feet, including single and family style residence rooms, simulation rooms for the FRA, and related living spaces for laundry, study, etc. The new construction building is estimated to be 30,000 square feet and includes classroom, office space, and tactical/simulation spaces. Questions concerning this RFQ package should be addressed to the Cochise College Procurement Services Department, via email - mountjoyj@cochise.edu : technical questions will be forwarded by Procurement Services to the appropriate staff member. All questions received will be answered at in a timely manner, or via written addendum Selection of the CMAR will be at the discretion of College and College reserves the right to reject any or all submittals.

Post-Bid

Educational

$14,200,000.00

Public - County

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
46
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

September 19, 2022

Project location map

4190 AZ-80, Douglas, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.