BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Mount Carroll, Illinois. Completed plans call for the renovation of a educational facility.

The West Carroll C.U.S.D. #314 is accepting bids for air conditioning in the remaining building at the West Carroll Middle School. The successful bidder will need to supply proof of warranties, payment of prevailing wage, and criminal background checks. Proposals must include: (1) Install Units sizing, required load AHU-1-91 tons and AHU-3-48 tons, (2) Install concrete pad south ofthe exiting condensing units and extend fencing around units, (3) Set standard efficiency dual circuit condensing units on new pad on (Carrie, Trane, or Daikin) (4) Modify existing air handler as required and install new cooling coil (include drain pan and blank off plates as required) (5) Complete refrigerant piping between condensing unit and coil as required by unit manufacture. Includes 'A" insulation on suction line, (6) Complete condensate drain to nearest floor drain (7) Install power wiring from Main distribution panel to new condensing units, includes ceiling removal and replacement as required, includes new breakers for the new equipment, new condensing units will include a disconnect, EMT conduit inside the building and Rigid Conduit outside, Install VFD on AHU-1 to modulate the supply fan based on duct static, (8) Temperature Controls, rework controls on the AHU to add in the DX cooling sequence, condensing units should include standalone controls for VAV operation including required temperature sensors and status sensors, temperature control system will send an enable and setpoint to the condensing unit, update graphics as required, exiting reheat zones, VAVs, etc will remain as is. (9) Furnish and Install Needle Point Ionization for (3) AHUs serving this building, Complete power wiring for each unit from nearest available breaker, Mount Ionization units before the coil area on each AHU, For units without air conditioning these will mount after the filter (10) Complete startup and check out of equipment (11) Test and balance AHUs to confirm design airflows

Award

Educational

$386,670.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
39
Bidding Soon
642
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2021

July 12, 2021

img_map_placeholder

633 S East St, Mount Carroll, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.