BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Shawnee, Kansas. Completed plans call for the renovation of a educational facility.

https://shawneemissionpost.com/2021/07/16/smsd-strong-bond-construction-underway-128004/ Upgrades underway at Shawnee Mission Early Childhood Education Center. Thanks to the $264.22 million bond referendum approved by voters in January 2021, it is a busy summer of construction in Shawnee Mission Schools. Upgrades are underway across the school district. We thank our community for voting in favor of this bond which supports our goal to have Shawnee Mission be ranked among the finest school districts in the nation, employing exceptional educators, who work in state-of-the-art facilities where learners achieve their full potential. Elementary Rebuilds Construction is underway on a new Westwood View Elementary School. Community members gathered on Wednesday, May 26, 2021 to hold a ceremonial groundbreaking for the building. Westwood View will feature: Flexible learning spaces for student collaboration Technology integrated throughout the building LEED certification Outdoor classrooms and dining area Safety and security installed to district standards A soccer field, walking trails, and playground equipment that is ADA accessible Westwood View is among five elementary school buildings that will be rebuilt as a result of the 2021 bond. John Diemer Elementary School is also scheduled to begin construction in 2021, followed by Pawnee Elementary School. Rushton and Tomahawk Elementary Schools are planned for rebuilds in 2023. Building Additions and Renovations Over the next few weeks, weight room additions and restroom renovations will be made at Shawnee Mission North High School. Shawnee Mission Northwest's restrooms and commons area will be remodeled. Indian Woods will also undergo a restroom remodel and three-story addition. Additional Upgrades in Summer 2021 HVAC: Indian Woods, Hocker Grove, Sunflower, Bluejacket-Flint, Rising Star, Indian Creek, and SM South. Playground Replacements: Belinder, Overland Park, Prairie, Roesland, and Sunflower. Roof Repair and Replacement: Shawnee Mission Early Childhood Education Center (SMEC-EC), Broken Arrow, and SM West. Asphalt Repair and Overlay: Apache, Briarwood, Brookridge, SMEC-EC, Comanche, Corinth, Indian Creek, Indian Woods, Overland Park, Trailridge, Career and Technical Campus (CTC), Operations and Maintenance Building, SM South, and SM West. Security Upgrades (Started in April 2021): Replacement of more than 2,000 cameras, 700 monitored doors, and multiple server upgrades/replacements across the district. Furniture Replacement: SM North, Trailridge, Horizons Carpet and Floor Tile Upgrades: Belinder, Ray Marsh, Nieman, Overland Park, and Westridge. Supporting Student Learning As a result of this bond, money that had been spent out of the capital fund for new facilities will now be covered by bond money. This allows the district to shift some custodial and maintenance salaries into the capital fund, freeing up money in the operating fund to hire additional secondary teachers and better support student learning. The district has affirmed its commitment to phasing in this adjustment beginning with the 2021-2022 school year. ____________ Nabholz Construction Corp. will accept sealed bids on the behalf of Shawnee Mission School District bond projects: All bid responses or inquiries should be sent to: Nabholz Construction, Kale Yoder, kale.yoder@nabholz.com , 913-393-6500, Zach Browne, zach.browne@nabholz.com 913-393-6500 Refer to the Instructions to Bidders section in the Construction Managers Manual for bidding instructions and obligations. Nabholz Construction Corp. encourages all small, minority-owned, women- owned, or disadvantaged business enterprises to submit bids for this project.

Post-Bid

Educational

$50,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
50
Bidding Soon
720
All Active Projects
305
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2021

July 2, 2021

img_map_placeholder

12701 W 67th St, Shawnee, KS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.