BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project involves reconstructing Bering Drive, Beverly Hill St, Schumacher Lane, and Star Lane from a two-lane roadway with roadside ditches to a curb and gutter roadway with storm sewer and cut-back parking. The project also involves installing sidewalks with ADA compliant wheelchair ramps, driveways, pavement markings, signage, traffic signal, speed cushions, etc. MBE- 26.2% - 27.3% WBE- 6.9% A. Project generally consists of removing and replacing existing roadway and sidewalk, adjusting existing waterlines and sanitary sewer lines, and adding storm sewer lines and swales with detention, as well as installation of street trees, including in-sidewalk tree grates and planting area. B. The project limits Include Star Lane, Schumacher Lane, and Beverly Hill Street from Fountain View Drive to Chimney Rock Road And Bering Drive from US 59 Frontage Road To Richmond Avenue. A. Removal of existing pavement, sidewalk, driveways, curbs, and asphaltic surfaces including flexible base materials. B. Removal of fences, curb stops, bollards, canopies, and small structures. C. Removal of 9,686 LF existing stormwater culverts, inlets, and manholes. D. Installation of new storm sewer consisting of approximately 9,463 LF of 7'X2' RCB, 6'X5' RCB, 6'x4' RCB, 6'X3' RCB, 6'X2' RCB, 2,896 LF of 24" RCP, 36" RCP, and 42" RCP, 1,392 LF of 18"x28.5" arch-pipe, and 608 LF of pipes from 4" to 12". All pipes and boxes to be installed by open-cutcomplete in place. Connect pipes from inlets and manholes to the existing off-site pipes. Installation of type "C" manholes and junction boxes as specified in plans. Adjust other manholes to grade. Install inlets at designated locations ("A" inlets, "BB" inlets, "C" inlets, and modified inlets). More details available in plans and specifications. E. Installation of approximately 17,514 SY of 9-inch reinforced concrete pavement with an additional 9,204 SY of high early strength reinforced 1. the MBE goal is 12.94 percent, and 2. the WBE goal is 8.72 percent

Bid Results

Roads / Highways

$17,573,797.00

Public - City

Paving, Site Work

441

10

10

7

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.