Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Port St Lucie, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
It is the intent of the City to enter into a unit price contract with one (1) qualified Contractor to provide all the labor, supervision, equipment, machinery, tools, materials, permits, transportation, utilities, and other incidentals required to complete the work in accordance with the Construction Plans prepared by American Consulting Engineers of Florida, LLC. There are five (5) sets of plans associated with this project, one (1) set for is for the Roadway, one (1) set is for Signalization, one (1) set is for Signing & Pavement Markings, one (1) set is for Lighting, and one (1) set is for Utility Relocations. This project is to construct approximately 0.6 miles of roadway from Gatlin Boulevard to just south of Darwin Boulevard including approximately 800-feet of Darwin Boulevard east of Gatlin Boulevard. This project includes, but limited to, earthwork, clearing and grubbing, drainage modifications, swale relocations, sidewalk construction, roadway reconstruction, turn lane reconstruction, utility relocations, traffic signals, record drawings, and all work and materials to provide a complete project as shown and described in the contract documents, bid specifications and plan set. The Contractor shall provide all materials, supplies, labor, and equipment necessary for a complete project necessary for a complete project based on all specifications and any contract amendments that may be deemed necessary. It is the Contractor's responsibility to familiarize themselves with the terms and conditions set forth in this document. Some requirements typical of a City of Port St. Lucie contract have been modified, including but not limited to, liquidated damages, lane closures and weather days. Additionally, it is imperative that the Contractor make continual progress on critical items of work from contract day 1 through completion and close-out of the project. NOTE: The City may not accept proposals from firms that have had adversarial relationships (filed disputes) with the City or firms that have represented entities that have had adversarial relationships with the City. This includes the firm, its employees and their financial or legal interests. NOTE: The City will not enter into a contract or conduct business with any firm or any personnel that is listed on the Federal, State, or other local government agencies, Excluded Parties List, Suspended List or Debarment List. This project is to construct approximately 0.6 miles of roadway from Gatlin Boulevard to just south of Darwin Boulevard including approximately 800-feet of Darwin Boulevard east of Gatlin Boulevard. This project includes, but limited to, earthwork, clearing and grubbing, drainage modifications,swale relocations, sidewalk construction, roadway reconstruction, turn lane reconstruction, utility relocations, traffic signals, record drawings, and all work and materials to provide a complete project as shown and described in the contract documents, bid specifications and plan set. The Contractor shall provide all materials, supplies, labor, and equipment necessary for a complete project necessary for a complete project based on all specifications and any contract amendments that may be deemed necessary.
Award
Roads / Highways
$8,006,448.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2021
September 20, 2021
Multiple Locations, Port St Lucie, FL
Related To This Project
Port St Lucie, FL
--
Port St Lucie, FL
Bid Date: Jan 10 2023
Port St Lucie, FL
Bid Date: Dec 08 2022
Port St Lucie, FL
Bid Date: Jan 06 2023
Port St Lucie, FL
--
Port St Lucie, FL
Bid Date: Jan 04 2023
Port St Lucie, FL
Bid Date: Dec 02 2021
Port St Lucie, FL
--
Port St Lucie, FL
Bid Date: Nov 21 2022
Port St Lucie, FL
--
Port St Lucie, FL
--
Port St Lucie, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.