BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Santa Fe Springs, California. Completed plans call for the renovation of a transportation facility.

Project Type: Engineering/Civil Ownership: Public Project City, State: Santa Fe Springs, California Local District: City of Santa Fe Spr Engineer Estimated Cost: $15,000 to $182,000 Pre-Qualification for Bidders: Not Required License Type Required: A, B, or C8 Project Duration: 25 Work Days Liquidated Damages: $500.00 Per Work Day Bid Bond Percentage: 100% The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans and Specifications. The general items of work include saw cutting concrete slab, removal of exposed steel posts, rebar and CMU blocks. The following shall be removed and replaced: steel bench, trash receptacle, concrete sidewalk and apron. A City representative will be present. Attendance will be taken for follow-up contact purposes only. A formal presentation is not planned; however, verbal questions will be answered only insofar as directing the request to the proper portion of the Bid documents. Submittal of written questions following the meeting is encouraged and the CITY will determine if a response is warranted. Response to written question will be in the form of a CITY-issued Addendum as identified elsewhere in the Specifications. Attendance at this meeting is not mandatory. The CITY will accept bids from Contractors that do not attend the meeting. There will be no follow-up pre- bid meeting for any contractors who may be unable to attend this meeting. To purchase Specs/Plans for this project, please complete and submit the form provided. Questions regarding the project should be directed to the Project Manager, Robert Garcia at (562) 862-0511, ext. 7545. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The general items of work include saw cutting concrete slab, removal of exposed steel posts, rebar and CMU blocks. The following shall be removed and replaced: steel bench, trash receptacle, concrete sidewalk and apron

Award

Transportation Terminals

$25,531.00

Public - City

Renovation

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
96
Bidding Soon
2,266
All Active Projects
1,005
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2021

August 5, 2021

img_map_placeholder

10900 Pioneer Blvd, Santa Fe Springs, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.