BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2021 at 8:00 PM

Updated May 7, 2025

Site work for a water / sewer project in Hollywood, Florida. Completed plans call for site work for a water / sewer project.

Q & A deadline: May 25, 2021 5:00:00 PM EDT A. The site, civil, drainage work to be performed includes furnishing and installing Catch Basin Structures with Baffle, Frame and Grate, Solid Pipes, Plugs, French Drains and site restoration for the installation of various drainage systems of various sizes at different locations in the City of Hollywood. The site restoration includes preliminary asphalt in accordance with the pavement restoration detail with milling and resurfacing of the entire lane, and pavement markings restoration. Work is to be as shown on the Contract Specifications, Contract Drawings and as described on the bid form (Section 00300) and on the Basis of Payment (Section 01025). Removal of existing drainage structures and pipes where new catch basins are proposed is included in the Clearing and Grubbing scope. All MOT, dewatering, restoration, as-built and any incidental related work is to be included in the bid price. B. Dewatering activities and bypass pumping that may be required for installations are the responsibility of the contractor. Discharge of dewatering liquids into the City's storm water drainage system is permitted providing the silt is removed via an appropriately sized settling box and returned via a filter bag or filter fabric over the return inlet. The return volume shall not exceed the storm water drainage system capacity, cause excess silting/clogging of the existing storm water system, or cause excess turbidity level in receiving waters. If silts/materials are deposited in the drainage system due to dewater activities, the contractor must remove the deposited materials at no additional cost to the City. Discharge of liquids generated by dewatering activities directly to bodies of water is not permitted. C. It is the intent of the CITY to obtain complete and working installations under this contract and any items of labor, materials or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. Maintenance of the existing utility systems is mandated throughout the construction period.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
106
Bidding Soon
1,734
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2021

July 12, 2021

Project location map

Multiple Locations, Hollywood, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.