BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. Questions Due Date: May 21st 2021, 12:00 PM EDT Remove the existing window curtains and curtain track channel. (Vendor dispose of curtains and hardware) o Furnish and install new ADC Trak Eze track channel complete with all necessary accessories for cord draw operation. (The track channel should be anchored into the existing wood header. o Furnish, fabricate and install new full height window curtains sewn flat with approximately 10% added fullness. o Furnish, fabricate and install new window valances made with 50% added fullness sewn into box pleats located 12" on center. o All window curtains will have black out lining sewn to the backside to help prevent color and light fade. o The valances will be squared off at the bottom (not scalloped like the existing valances). All curtains will have 4" side and bottom hems. Grommets to be inserted in the heading of the full height window curtains for s-hook attachment to the hanging hardware. o The valances will be tacked in place on the existing nailer board. Furnish, fabricate and install new curtains made in typicalstage manner using 50% added fullness sewn into box pleatslocated 12" on center. Grommets will be inserted in the center of each pleat for either s-hook or tie line attachment to the hanging hardware. All side and bottom hems will be 4". The bottom hems of all floor length curtains will have an internal pocket containing a continuous length of chain for added weight. Furnish and install new ADC 170 Be Steel track channel complete with all necessary accessories for cord draw operation for the rear curtain.

Bid Results

Educational

$709,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
124
Bidding Soon
1,804
All Active Projects
803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 13, 2023

img_map_placeholder

3014 W 39th Pl, Chicago, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.