Site work and paving for a mixed-use development in Griffith, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of Sept. 21, 2021, the project was awarded to Milestone Contractors North, Inc. of Griffith, IN bid of $12,376,903.00. The start and completion date has not yet determined. Bids are solicited for the site improvements for the Town of Griffith Sidewalk Replacement Program - Contract B in Griffith, IN 46319. Construction work will include sidewalk removal and replacement, driveway removal and replacement, curb ramp removal and replacement, tree removal, tree root pruning, grading and excavation for sidewalk, and all other appurtenances to install sidewalk at various areas within the Town of Griffith. No Bidder may withdraw their Bid within a period of 60 days following the date set for the receiving of bids. The Owner reserves the right to retain any and all bids for a period of not more than 60 days and all bids shall remain in full force and effect during said time. The Owner further reserves the right to waive informalities and to award the Contract to the Bidder Owner determines to be the lowest responsive and responsible bidder, all to the advantage of the GRIFFITH TOWN COUNCIL, or to reject all bids Each bid shall be accompanied by an acceptable certified check made payable to the TOWN OF GRIFFITH or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. Bidders Procedure Checklist completed and signed, and documentation specified in the Checklist, including Standard Questionnaire Form 96 (2013 revision), completely filled out and signed, including attachment of Contractor's Financial Statement as stipulated in Section III of Form 96, must be submitted with every Bid.

Award

Sidewalks / Parking Lot

$12,376,903.00

Public - City

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
89
Bidding Soon
2,155
All Active Projects
877
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2021

September 15, 2021

img_map_placeholder

Multiple Locations, Griffith, IN

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Sidewalk Replacement Program - Contract B

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.