BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in New York, New York. Working plans call for site work for a road / highway; and for paving for a road / highway.

https://www.governor.ny.gov/news/governor-cuomo-announces-start-451-million-project-reconstruct-key-ramp-cross-bronx-expressway Ramp from Northbound Sheridan Boulevard to Westbound Cross Bronx Expressway in the Bronx to be Rebuilt and Four Nearby Bridges Repaired Project Builds on the State's Unprecedented Investment in the South Bronx Governor Andrew M. Cuomo today announced the start of a $45.1 million project to reconstruct and realign the 700-foot-long entrance ramp leading from northbound Sheridan Boulevard to westbound Cross Bronx Expressway (Interstate 95) in the Bronx. The 70-year-old ramp will be replaced by a modern structure with wider shoulders, concrete protective barriers and a smoother curvature that will ease traffic flow and enhance safety along this busy corridor. Reconstruction of the ramp, which handles more than 8,000 vehicles a day, will help keep highway traffic off local roads. Structural repairs will also be made to four nearby bridges and new landscaping added to the pedestrian and bicycle path leading to Starlight Park. The project complements the state's unprecedented investment to enhance infrastructure in the South Bronx. "This project will further the tremendous progress we have made in the South Bronx by removing the physical barriers that for years have hampered growth and impacted quality of life," Governor Cuomo said. "The reconstructed ramp and other improvements help to reduce congestion and create better travel conditions along this vital corridor, fostering vitality and economic opportunity throughout the community." The existing ramp, which currently consists of nine bridge spans, will be rebuilt using four spans, which will reduce the number of required bridge joints and significantly decrease future maintenance needs. Rebuilding with fewer spans, including the elimination of one pier that currently extends into the Bronx River, will also create more open space below the bridge and improve the environmental quality of the river. Scheduled for completion in spring 2023, the new ramp will provide a service life of approximately 75 years. New, energy-efficient LED lights will also be installed on the ramp. During construction, a temporary ramp will be built from southbound Sheridan Boulevard to the westbound Cross Bronx Expressway to ensure continued traffic flow. In addition, a temporary left turn signal will be installed at northbound Sheridan Boulevard to allow traffic to access the westbound Cross Bronx Expressway. Improvements - including bearing and joint replacements, pavement resurfacing and repairs to the concrete, railings and bridge decks - will also be made to three bridges along the Cross Bronx Expressway between West Farms Road and the Bronx River Parkway and the eastbound Cross Bronx Expressway exit ramp to southbound Sheridan Boulevard. Additionally, the project will plant native trees and vegetation to enhance the natural landscape along the pedestrian and bicycle pathway leading from East 177th Street to Starlight Park. This project builds on the South Bronx's transformational progress under Governor Cuomo's leadership that also includes the transformation of the Sheridan Expressway from an interstate highway to a pedestrian-friendly boulevard; the rehabilitation of the Bruckner Expressway; and the ongoing Hunts Point Access Improvement Project. New York State Department of Transportation Commissioner Marie Therese Dominguez said, "The start of this project marks another great step forward for the Bronx and demonstrates yet again Governor Cuomo's commitment to building a 21st Century transportation network that benefits all residents. The Department of Transportation is proud to have played a major role in helping to make the Governor's vision for a revitalized Bronx a reality through our work on the Hunts Point and the Sheridan Boulevard and Bruckner Expressway projects; and we are delighted to get going with this new and exciting project." ________ This project will construct/extend the northbound I-95 fourth travel lane from Exit 8B (to Orchard Beach/City Island) to Exit 9 (to northbound Hutchinson River Parkway) and a northbound Hutchinson River Parkway exit ramp to Co-Op City at Bartow Avenue in Bronx County, NYC. This Project is Located in the Capital District Region and Includes the Following: Counties Bronx As of May 25, 2021,The current status of the project is In Development. The Bid Opening is expected to be in Summer 2021. Construction is expected to begin in Fall 2021. Construction is expected to be completed in Winter 2023/2024. NYSDOT - Bruckner Expwy - Hutchinson Pkwy Mobility Improvement Project *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$37,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
240
Bidding Soon
4,576
All Active Projects
2,042
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2023

img_map_placeholder

I-95, New York, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.