BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2021 at 8:00 PM

Updated September 15, 2023

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a detention facility.

Estimated Range- $250,000 - $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description of the Work: 1. Drainage of existing 10,000 gallon wood water tank prior to bypass connection. 2. Installation of new 3" piping and valves to allow bypass flow through domestic booster pump system while tank is being replaced. 3. Remove existing lightning protection system. 4. Demolition of existing 10,000 gallon wood water storage tank. 5. Painting repairs to existing tank support structure. 6. Construction of new 10,000 gallon wood water storage tank.

Bid Results

Water / Sewer

$444,050.00

Public - State/Provincial

Renovation

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,012
Active Projects
561
Bidding Soon
7,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2021

July 30, 2021

Project location map

47-04 Van Dam St, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.