BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tofte, Minnesota. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. This project will consist of constructing a 10-foot wide bituminous shared use path for approximately 3,200 LF along the southbound travel lane of TH 61. Americans with Disabilities Act (ADA) compliant pedestrian crossings will be constructed as part of this project. This project will also require embankment construction throughout the project corridor with spot locations of excavation for topsoil salvaging and storm sewer installation. New culverts will be installed at all entrances within project limits. Other project work includes concrete curb & gutter, concrete aprons at entrances, turf establishment, placement of riprap, pavement marking, and trail/roadway signage. This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 3% (TG/ED/VO) subcontracting goal established. No pre-bid meeting is scheduled.

Bid Results

Roads / Highways

$1,088,000.00

Public - State/Provincial

Paving, Site Work

3

10

2

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
10
Bidding Soon
102
All Active Projects
36
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2021

August 16, 2021

img_map_placeholder

Gitchi Gami State Trail, Tofte, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.