Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Tofte, Minnesota. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.
The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. This project will consist of constructing a 10-foot wide bituminous shared use path for approximately 3,200 LF along the southbound travel lane of TH 61. Americans with Disabilities Act (ADA) compliant pedestrian crossings will be constructed as part of this project. This project will also require embankment construction throughout the project corridor with spot locations of excavation for topsoil salvaging and storm sewer installation. New culverts will be installed at all entrances within project limits. Other project work includes concrete curb & gutter, concrete aprons at entrances, turf establishment, placement of riprap, pavement marking, and trail/roadway signage. This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 3% (TG/ED/VO) subcontracting goal established. No pre-bid meeting is scheduled.
Bid Results
Roads / Highways
$1,088,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2021
August 16, 2021
Gitchi Gami State Trail, Tofte, MN
Related To This Project
Tofte, MN
Bid Date: Nov 26 2024
Tofte, MN
Bid Date: Jan 17 2023
Tofte, MN
Bid Date: Jun 24 2022
Tofte, MN
Bid Date: Oct 12 2022
Tofte, MN
Bid Date: Oct 13 2022
Deephaven, MN
Bid Date: Jul 28 2021
Waconia, MN
Bid Date: Jul 23 2021
Palisade, MN
Bid Date: Jul 23 2021
Albany, MN
Bid Date: Jul 22 2021
Osakis, MN
Bid Date: Jan 07 2022
Waconia, MN
Bid Date: Sep 21 2021
Rochester, MN
Bid Date: Aug 10 2021
Minneapolis, MN
Bid Date: Aug 10 2021
Walker, MN
Bid Date: Aug 10 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.