Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Deland, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
https://www.bizjournals.com/orlando/news/2023/07/20/i-4-beyond-the-ultimate.html Jul 20, 2023 The Florida Department of Transportation has dialed up more work coming soon for Interstate 4's latest construction. FDOT opened a new auxiliary lane on westbound I-4 between State Road 429 and County Road 532 on July 19. The project is one of multiple pieces of construction for the multibillion-dollar project, which includes 20 miles of roadway to the east and to the west of the prior I-4 Ultimate project. Why this matters: New transportation infrastructure can create opportunities for contractors. Projects can also create temporary construction jobs and aim to improve regional connectivity. An eastbound I-4 auxiliary lane opened in May, and work continues on other parts of the project. Four upcoming construction projects include: I-4 and U.S. 17-92 Interchange: Changes to the Seminole County interchange include improving sight distance for motorists, upgrading sidewalks for pedestrians and reducing the speed limit to 35 mph. Work will include a new auxiliary lane on eastbound U.S. 17-92 between the westbound I-4 exit ramp and Monroe Road. Construction is projected to start this fall. Capacity Improvements to County Road 46A and Rinehart Road Intersection: The project in Seminole County will add some turn lanes and reconfigure other lanes to improve traffic flow at the intersection. Construction is projected to start this fall. Interstate 4 to State Road 528 Ramp Widening: The project will bring the westbound I-4 ramp to eastbound Beachline Expressway from one lane to two. Work is expected to start this year. I-4 at Apopka-Vineland Road Interchange Improvements: Work will include a longer westbound I-4 exit ramp to Apopka-Vineland Road, building a new loop ramp from northbound Apopka-Vineland Road to westbound I-4 as well as milling and resurfacing Apopka-Vineland Road. Work will start in the fall. The I-4 at Apopka-Vineland Road will also include part of a single westbound express lane that will be built over three separate projects from west of State Road 536 to west of Sand Lake Road. The segment that is part of the interchange project includes from west of State Road 536 to west of Daryl Carter Parkway. For 12 months ending in May, total nonbuilding starts were 30% higher than the same period in 2022, according to Do-dge Construction Network. Highway and bridge starts were up 22%. Richard Branch, chief economist for Do-dge Construction Network, said in a prepared statement that public and private construction have split in terms of how they are faring. "Public dollars are flooding into the manufacturing and infrastructure sectors, leading to significant growth over the last year," Branch said. "Meanwhile, the mostly private sectors of the building market like offices, multifamily and retail are struggling under the weight of higher interest rates, tightening lending standards and declining demand." ___________________________________________________ Segment 3 features the construction, widening and/or replacement of 25 bridges. In addition to 26 existing stormwater ponds, crews will build nine new ponds. Interstate 4 (I-4) from 1 mile east of S.R. 434 in Longwood to east of U.S. 17-92 at the Seminole-Volusia county line. As of March 2, 2023, this project is in the right-of way acquisition phase. Information regarding design team and contractor selection has not been disclosed. Construction is estimated to take place in fiscal year 2034.
Conceptual
Roads / Highways
$607,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2030
I-4, Deland, FL
Related To This Project
Deland, FL
Bid Date: Jul 29 2022
Deland, FL
Bid Date: Jul 25 2024
Deland, FL
Bid Date: Sep 08 2021
Deland, FL
Bid Date: Apr 06 2021
Deland, FL
--
Deland, FL
--
Deland, FL
Bid Date: Dec 14 2021
Deland, FL
--
Deland, FL
Bid Date: Apr 05 2022
Deland, FL
--
Deland, FL
Bid Date: May 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.