BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Evanston, Illinois. Completed plans call for site work for a water / sewer project.

Work on this project includes rehabilitation of approximately 5,875 feet of combined sewer main, 6-inch to 18-inch in diameter, using the cured-in-place pipe (CIPP) lining method of rehabilitation. No Pre-Bid Conference Available The Evanston City Council also reserves the right to award the contract to an Evanston firm if that firm's bid is within 5% of the low bid. All bid items shall be completed by October 17, 2021 or within 90 calendar days of the Agreement Date, whichever is later. The City of Evanston has a goal of awarding 25% of its contracts to MinorityOwned, Women-Owned, and Evanston-based businesses (M/W/EBEs).

Award

Water / Sewer

$362,789.00

Public - City

Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
511
Active Projects
288
Bidding Soon
3,660
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2021

July 22, 2021

Project location map

Multiple Locations, Evanston, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.