Published August 10, 2021 at 8:00 PM
Updated August 21, 2025
Demolition, site work, renovation and addition to an educational facility in Rockvale, Tennessee. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.
For more information and specifications, contact Joseph Binkley, Binkley-Garcia Architects. The Work of this Contract shall include the furnishing of all labor, materials, equipment, tools, construction equipment and machinery, water, heat utilities, transportation, insurance, taxes, superintendence, coordination and miscellaneous services required for the construction and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated into the Work. All Work shall be performed in strict accordance with the Contract Documents. In the event of conflict within the Contract Documents or within these Specifications, the provisions of the more stringent, as determined by the Architect, shall govern. The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by these allowances shall be supplied for such amounts and by such persons as the Architect may direct. Designate in Construction Schedule delivery dates for products under each allowance. Designate in Schedule of Values quantities of materials specified under unit cost allowances. Work includes, but is not limited to, the construction of approximately 40,000 square feet on two levels. Construction includes exterior and interior load bearing block walls, brick veneer, concrete slab on grade, concrete and block foundation walls and concrete footings. Second floor construction is concrete plank with topping slab. Roof construction is fully adhered EPDM roofing over rigid insulation over metal deck, sloped to exterior gutters and downspouts. Windows are aluminum storefront; exterior doors and frames are hollow metal. Interior doors are solid wood with plastic laminate faces. Interior finishes include, but are not limited to, vinyl composition tile, resinous flooring, carpeting and sealed concrete. Interior wall finish includes epoxy paint and ceramic tile. Ceilings are suspended grid with lay-in acoustical tile and limited painted gypsum board ceilings. Complete mechanical, plumbing, fire protection, and electrical systems are included. Complete site work is included in the project.
Under Construction
Educational
$9,177,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2021
August 1, 2021
6543 State Hwy 99, Rockvale, TN
Related To This Project
Rockvale, TN
Bid Date: Aug 31 2021
Rockvale, TN
--
Rockvale, TN
Bid Date: Nov 16 2021
Rockvale, TN
--
Rockvale, TN
Bid Date: Jan 25 2023
Rockvale, TN
Bid Date: May 13 2022
Rockvale, TN
--
Rockvale, TN
Bid Date: Dec 09 2022
Middleton, TN
Bid Date: Sep 26 2025
Gordonsville, TN
Bid Date: Sep 04 2025
Elizabethton, TN
Bid Date: Aug 19 2025
Dyersburg, TN
Bid Date: Aug 29 2025
Blountville, TN
Bid Date: Sep 12 2025
Columbia, TN
Bid Date: Oct 30 2025
Cookeville, TN
Bid Date: Aug 19 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.